Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Feras Abu-Jafar"'
Autor:
Tossapol Tongkum, Khamawat Siritheerasas, Feras Abu Jafar, Chulakorn Yosakrai, Ali Abbasgholipour
Publikováno v:
Day 2 Wed, March 23, 2022.
Mubadala Petroleum conducts a fast-paced drilling program in the Gulf of Thailand, where rapid response resolutions are often required. This paper demonstrates the Remote Operation (RO) approach, which is an integrated approach comprised of people, s
Publikováno v:
Day 1 Tue, March 23, 2021.
The Well X in Nong Yao field, is an infill-well designed for the Gulf of Thailand which presented several interesting challenges due to its complexity, tortuosity, and potential collision risks with other wells. This paper demonstrates the applicatio
Autor:
Pham Nam Hieu, Trinh Dinh Phu, Ali Abbasgolipour, Manchukarn Naknaka, Feras Abu-Jafar, Pattarapong Prasongtham, Khamawat Siritheerasas
Publikováno v:
Day 2 Wed, March 24, 2021.
The objective of this research is to describe the methodology used to drill the most extended reach well (ERD) in the Gulf of Thailand. The Jasmine field is a mature, sophisticated, oil field with many shallow reservoir targets that require a minimum
Autor:
Anh Duong, Ian McManus, Ambuj Johri, Viraphon Thanasarnpisut, Pattarapong Prasongtham, Feras Abu-Jafar, Mohd Shafie Jumaat, Choosak Orprasert
Publikováno v:
Day 1 Mon, November 09, 2020.
Effective zonal isolation in wellbores with a challenging mud removal environment is well known to be very difficult to achieve. In wells at the technical limits of Non- Aqueous Fluid (NAF) removal prior to cement placement, cement bond quality and h
Autor:
Ikenna Chigbo, Thanudcha Khunmek, Keith Parrott, Ajana Laoroongroj, Ismarullizam Mohd Ismail, Feras Abu-Jafar
Publikováno v:
Day 3 Wed, November 13, 2019.
This paper describes a pilot program for the application of an Autonomous Inflow Control Device (AICD) by retrofitting an existing ICD completion for reservoir optimization. New drill horizontal wells were required to be completed with AICD's to enha
Publikováno v:
Day 4 Thu, November 14, 2019.
This paper will discuss completion design and the deployment method of sand control for multi-zone completion wells in the Nong Yao field. The discussion will cover sand control and completion techniques from given reservoir characteristics, in combi
Autor:
Feras Abu-Jafar, Ian McManus, Jorge Andres Vargas Bermea, Viraphon Thanasarnpisut, Kingkarn Kaewpraphan, Tossapol Tongkum, Pakaporn Wuttikamonchai
Publikováno v:
Day 4 Thu, November 15, 2018.
Lost circulation, while cementing, compromises the objectives of cementing an oil or gas well. Losses encountered during cementingcan cause a weak casing shoe, poor zonal isolation, early water breakthrough for an oil producer, as well as increasing
Publikováno v:
Day 3 Wed, November 14, 2018.
In a global first, Mubadala Petroleum in Thailand has successfully completed a three-month trial of a new technology designed to improve the operational performance of the regular program of well maintenance workovers required for its Gulf of Thailan
Autor:
Feras Abu Jafar
Publikováno v:
Proc. Indonesian petrol. Assoc., 39th Ann. Conv..