Zobrazeno 1 - 10
of 37
pro vyhledávání: '"Feng-Bor Lin"'
Publikováno v:
Journal of Civil Engineering and Management, Vol 12, Iss 4 (2006)
Owing to financial constraints, it becomes imperative to rank major transport projects to determine implementation priorities and budget allocations. The central Government in Taiwan is using rankings derived from the Analytic Hierarchy Process (AHP)
Externí odkaz:
https://doaj.org/article/d859efb2b2764dcf8f4dd2b67dc39de0
Publikováno v:
Transportation Research Record: Journal of the Transportation Research Board. 2130:101-108
The 12.9-km-long Shea-San Tunnel, located on Taiwan's 54-km-long National Highway 5 (NH-5), has two one-way tubes. To minimize accidents and to respond to the need for improved operating efficiency on NH-5, Taiwan's Bureau of National Highways adopts
Publikováno v:
Transportation Research Record: Journal of the Transportation Research Board. 2027:85-90
Many models for the analysis of capacity and signal timing of signalized intersections are based on the assumption that queue discharge will quickly reach a steady maximum rate after the green interval begins. This assumption leads to a common practi
Autor:
Feng-Bor Lin, Daniel R. Thomas
Publikováno v:
Transportation Research Record: Journal of the Transportation Research Board. 1920:81-85
Current methodologies for estimation of intersection capacity are based mainly on the concept of saturation flow. Saturation flow is the steady maximum queue discharge rate after the green light is turned on. According to the U.S. Highway Capacity Ma
Autor:
Feng-Bor Lin
Publikováno v:
Transportation Research Record: Journal of the Transportation Research Board. 1776:69-74
Main-line toll plazas are major bottlenecks on toll roads. The capacity and level-of-service analysis of these facilities, however, have not been addressed by the various versions of the Highway Capacity Manual. Traffic operations at toll plazas can
Autor:
Feng-Bor Lin
Publikováno v:
Transportation Research Part B: Methodological. 26:221-240
The average cycle length and green intervals of a traffic-actuated signal operation are two parameters commonly used in a delay model for evaluating the level of service of the signal operation. The current method suggested in 1985 Highway Capacity M
Autor:
Feng-Bor Lin
Publikováno v:
Journal of Transportation Engineering. 116:181-186
Current practices in resurfacing, restoration, and rehabilitation of highways generally emphasize lane- and shoulder-width improvements. These practices neglect the possibility that flattening curves by reducing curvature may achieve more cost-effect
Publikováno v:
Journal of Civil Engineering & Management; 2006, Vol. 12 Issue 4, p285-291, 7p
Autor:
Lester A Hoel, Feng-Bor Lin
Publikováno v:
Transportation Engineering Journal of ASCE. 103:307-320
Existing utility-based transportation plan evaluation approaches are proven to be fallacious in providing information for decision making. Their weaknesses result primarily from erroneous uses of measurement scales and value transformation functions.
Autor:
Feng-Bor Lin
Publikováno v:
Transportation Research. 12:21-28
To aid design and evaluation of pedestrian actuated traffic signal control system, a simulation model is used along with theoretical considerations to develop a set of equations which depict the performance of the system in terms of frequency of pede