Zobrazeno 1 - 10
of 34
pro vyhledávání: '"Felix Winter"'
Publikováno v:
PLoS Computational Biology, Vol 8, Iss 12, p e1002815 (2012)
The present work exemplifies how parameter identifiability analysis can be used to gain insights into differences in experimental systems and how uncertainty in parameter estimates can be handled. The case study, presented here, investigates interfer
Externí odkaz:
https://doaj.org/article/a145a6d39b1e47f8bfed7d2671745b15
Publikováno v:
Journal of Scheduling. 25:339-370
In this paper, we introduce a new problem in the field of production planning, called the production leveling problem. The task is to assign orders to production periods such that the load in each period and for each product type is balanced, capacit
Autor:
Felix Winter, Nysret Musliu
Publikováno v:
Metaheuristics ISBN: 9783031265037
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::12518d992adba780f4454be310547ed6
https://doi.org/10.1007/978-3-031-26504-4_20
https://doi.org/10.1007/978-3-031-26504-4_20
Publikováno v:
Metaheuristics ISBN: 9783031265037
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9d5063cb4f2f5cf90ee6af8e0a6d5e9c
https://doi.org/10.1007/978-3-031-26504-4_29
https://doi.org/10.1007/978-3-031-26504-4_29
Autor:
Friedrich Sommer, Felix Winter
Publikováno v:
Controlling. 34:35-38
Wichtiger Bestandteil von Unternehmenskaufverträgen sind Garantien des Verkäufers. Als Instrument des Risikomanagements können Warranty-and-Indemnity-Versicherungen Haftungsrisiken für Verkäufer und Risiken der Anspruchsdurchsetzung für Käufer
Publikováno v:
Journal of Scheduling. 25:507-534
In this paper, we study an important real-life scheduling problem that can be formulated as an unrelated parallel machine scheduling problem with sequence-dependent setup times, due dates, and machine eligibility constraints. The objective is to mini
Autor:
Felix Winter, Nysret Musliu
Publikováno v:
Journal of Scheduling. 25:453-475
Minimizing the setup costs caused by color changes is one of the main concerns for paint shop scheduling in the automotive industry. Yet, finding an optimized color sequence is a very challenging task, as a large number of exterior systems for car ma
Autor:
Felix Winter, Nysret Musliu
Publikováno v:
Proceedings of the Genetic and Evolutionary Computation Conference Companion.
Publikováno v:
Proceedings of the International Conference on Automated Planning and Scheduling. 31:500-508
In industrial artificial teeth manufacturing, nowadays a high level of automation is utilized to produce a large quantity of teeth in short production cycles. As a large variety of different product shapes and colors have to be processed on a single
Publikováno v:
Suchttherapie. 22:75-85
ZusammenfassungDer Kenntnisstand zu Prävalenzen und Krankheitsverläufen älterer, einsamer Männer, die an Alkoholstörungen leiden, ist immer noch sehr gering und damit auch das Hilfeangebot. Die vorliegende systematische Literaturrecherche identi