Zobrazeno 1 - 10
of 15
pro vyhledávání: '"Fatima Benbouzid-Sitayeb"'
Publikováno v:
KES
This paper presents a multi-objective immune memetic algorithm to the challenge of solving the Frequency Assignment Problem (FAP) in cellular networks seeking the minimization of the network’s total interference, the maximum interference and the nu
Publikováno v:
Applied Soft Computing. 59:556-573
This work focuses on the problem of scheduling jobs on a single machine that requires flexible maintenance under human resource competence and availability constraints. To solve the problem we developed two fuzzy genetic algorithms that are based on
Publikováno v:
Engineering Applications of Artificial Intelligence. 87:103265
This paper investigates hybridization of multi-objective memetic algorithm and artificial immune system (AIS) for the Frequency Assignment Problem (FAP) in cellular mobile networks. The considered objectives to minimize are the total interference, th
Publikováno v:
Applied Soft Computing. 85:105797
This paper presents a novel multi-objective hybrid metaheuristic that combines an artificial immune system (AIS) with genetic operators to address the multi-objective Frequency Assignment Problem (FAP) in cellular mobile networks, seeking to minimize
Publikováno v:
Advanced Approaches to Intelligent Information and Database Systems ISBN: 9783319055022
In this paper, we present ETOMA a multi-agent framework dedicated to developing and testing floor shop production schedules. It is applied for both production and joint production and maintenance scheduling as well. ETOMA architecture is composed of
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::889a9efe50112c4bb80ffc95cec710ae
https://doi.org/10.1007/978-3-319-05503-9_8
https://doi.org/10.1007/978-3-319-05503-9_8
Publikováno v:
2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO).
Joint production and maintenance scheduling has been widely studied and many solutions have been proposed. However, all proposed solutions consider production tasks as maintenance ones. In fact, these task types have different constraints and can't b
Publikováno v:
ISDA
Many works refer to the scheduling problem of both preventive maintenance and production activities. Few works concern the dynamic scheduling problem of these two activities. This aspect is mainly concerned by corrective maintenance activities (equip
Publikováno v:
Computational Collective Intelligence. Technologies and Applications ISBN: 9783642239373
ICCCI (2)
ICCCI (2)
In this paper, we propose a distributed approach using multiagent paradigm for scheduling independent jobs and maintenance operations in the flowshop sequencing problem. The proposed system introduces a dialogue between two communities of agents (pro
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::d96909e4c5083b5a025ad44a036a98ac
https://doi.org/10.1007/978-3-642-23938-0_7
https://doi.org/10.1007/978-3-642-23938-0_7
Autor:
Sid Ali Guebli, Noureddine Zerhouni, Fatima Benbouzid-Sitayeb, Christophe Varnier, Yassine Bessadi
Publikováno v:
International Journal of Manufacturing Research
International Journal of Manufacturing Research, Inderscience, 2011, 6 (1), pp.30-48. ⟨10.1504/IJMR.2011.037912⟩
International Journal of Manufacturing Research, Inderscience, 2011, 6 (1), pp.30-48. ⟨10.1504/IJMR.2011.037912⟩
International audience; Usually, scheduling of maintenance operations and production sequencing are dealt with separately in the literature and, therefore, also in the industry. Given that maintenance affects available production time and elapsed pro
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::ddeb78ec8355a12de88a29676853bd22
https://hal.archives-ouvertes.fr/hal-00720671/file/FatimaBenbouzidSitayeb_Maintext_IJMR.pdf
https://hal.archives-ouvertes.fr/hal-00720671/file/FatimaBenbouzidSitayeb_Maintext_IJMR.pdf
Publikováno v:
2008 3rd International Conference on Information and Communication Technologies: From Theory to Applications.
In this paper a sequential resolution of the joint production and preventive maintenance scheduling problem in permutation flowshops is considered with the objective of minimizing the makespan. The proposed sequential algorithm, called SAS, consists