Publikováno v:
Aceh International Journal of Science and Technology, Vol 8, Iss 2, Pp 86-94 (2019)
Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to proj
Externí odkaz:
https://doaj.org/article/ca1db4c09d9b4dc49f72dcd89d92badc
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality
Publikováno v:
Aceh International Journal of Science and Technology, Vol 8, Iss 2, Pp 106-113 (2019)
The construction involves a series of activities that possibly face problems or risks. The risk probability is an uncertain condition that results in a negative impact on the project objectives. Threats can come from the resources factor in a constru
Externí odkaz:
https://doaj.org/article/c5858b673c2941f585e3cbbfe0713df3
Autor:
Fachrurrazi Fachrurrazi
Publikováno v:
I-Economics: A Research Journal on Islamic Economics, Vol 5, Iss 1, Pp 17-36 (2019)
The ideal goal of interactions that an ethnic group performs within itself or with other ethnic groups entails more than mere actualization of values; good and bad, proper and improper, right and wrong. The diverse ethnic groups living together in th
Externí odkaz:
https://doaj.org/article/5c5907be73ad442a985cc32b1e372a22
Autor:
Agus, Suci Tiara, Mubarak, Mubarak, Fachrurrazi, Fachrurrazi, Rizalihadi, Maimun, Ziana, Ziana
Publikováno v:
AIP Conference Proceedings; 2024, Vol. 3082 Issue 1, p1-8, 8p
Autor:
Fachrurrazi Fachrurrazi
Publikováno v:
Sukma: Jurnal Pendidikan, Vol 1, Iss 2, Pp 281-300 (2017)
The article discusses the relationship between teacher professional competences and teacher work-autonomy at Sukma Bangsa Schools in Aceh, Indonesia. The study investigated differences in teacher professional competences and teacher work-autonomy in
Externí odkaz:
https://doaj.org/article/1c310ee7457242b483031dc891390dda
Publikováno v:
Jurnal Arsip Rekayasa Sipil dan Perencanaan. 5:308-317
Publikováno v:
Advances in Civil Engineering, Vol 2019 (2019)
Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction. Therefore the variables need to be eliminated. The aim of this study is ranking the risk variable base
Externí odkaz:
https://doaj.org/article/83de28b4e0bb4d6db9c45d565b18c0bf
Publikováno v:
Jurnal Teknik Sipil. 10:106-113
Beton menjadi pilihan utama dalam pembangunan struktur dikarenakan kekuatan tekan yang dihasilkannya tinggi. Dibutuhkan metode yang tepat dalam memprediksi kuat tekan beton sehingga dapat mempermudah perencanaan campuran beton sebelum dilakukannya pe
Publikováno v:
Khatulistiwa. 10:43-61
The phenomena of Islamic Defence Action (ABI) has been raising two argumentations: Firstly, the strengthening of religious conservatism. Secondly, ABI is better organized by conservative group and Muslim middle class such as Muslim student activist.
Publikováno v:
MATEC Web of Conferences, Vol 197, p 10004 (2018)
A Project Estimator cannot claim that his/her estimated duration is better than others. They can determine the reasonable duration based on deterministic and probabilistic factors affecting the duration and then specify how to achieve it. This condit
Externí odkaz:
https://doaj.org/article/90466bc944404a9cae1784820be1b18e