Zobrazeno 1 - 10
of 87
pro vyhledávání: '"F. Zanellini"'
Publikováno v:
International Journal of Electrical Power & Energy Systems. 28:712-722
The unit commitment problem, originally conceived in the framework of short term operation of vertically integrated utilities, needs a thorough re-examination in the light of the ongoing transition towards the open electricity market environment. In
Publikováno v:
Electric Power Systems Research. 76:549-556
In this paper, the problem of finding the optimal topological configuration of a power transmission system is considered with the aim of providing system operators with a tool suited for congestion management. Network reconfiguration looks particular
Publikováno v:
IEEE Transactions on Power Systems. 21:333-340
Parallel (or loop) flows consist in the undesired circulation of power flows through certain interconnection corridors. Remedial actions available to transmission system operators or system planners include installation and operation of phase-shiftin
Publikováno v:
IEEE Transactions on Power Systems. 19:1048-1057
The electricity markets are changing the power system operation. The increasing power exchanges make it necessary to operate the transmission grids closer and closer to security limits. A problem posed to power system engineers is therefore to find a
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
2008 43rd International Universities Power Engineering Conference.
The problem of cross border interchange and of exchange capacity allocation has gained an increasing importance because of existing price gaps between the different countries and of limited exchange capacity. The European Transmission System Operator
Publikováno v:
2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
The problem of cross border interchange and of allocation of exchange capacities between interconnected countries of the European Community has gained an ever increasing importance during the most recent years. The reasons for that are to be found in
Publikováno v:
MELECON 2008 - The 14th IEEE Mediterranean Electrotechnical Conference.
The problem of cross border interchange and of allocation of exchange capacities between interconnected countries of the European community has gained an ever increasing importance during the most recent years. The reasons for that are to be found in
Publikováno v:
International Journal of Emerging Electric Power Systems. 8
Unit commitment (UC), originally employed to minimize the generating cost of a vertically integrated utility, has become a basic tool for revenue adequacy evaluation by GENeration COmpanies (GENCOs). The strategic role of UC is apparent in those mark