Engineering, Vol 1, Iss 4, Pp 447-452 (2015)
We describe a specific approach to capacity management for distribution grids. Based on simulations, it has been found that by curtailing a maximum of 5% of the yearly energy production on a per-generator basis, distribution grid connection capacity
Externí odkaz:
https://doaj.org/article/87fabfb2952249128fd84dcdd8745ca3
Publikováno v:
Engineering, Vol 1, Iss 4, Pp 447-452 (2015)
We describe a specific approach to capacity management for distribution grids. Based on simulations, it has been found that by curtailing a maximum of 5% of the yearly energy production on a per-generator basis, distribution grid connection capacity
Autor:
Tanja Schmedes, Benjamin Deppe, Enno Wieben, Magnus Pielke, Nasser G.A. Hemdan, Michael Kurrat
Publikováno v:
Electric Power Systems Research. 116:355-366
The main concern of integration the renewable energy into the supply grid, in Germany, is to reach about 35% of the total generation by 2030. In this case, a large amount of the produced power will be provided as Decentralized Generation (DG). Theref
Autor:
Xin Guo, Michael Stadler, Elke Hohn, Till Luhmann, Riccardo Treydel, Enno Wieben, Thomas Kumm, Matthias Rohr
Publikováno v:
Progress in IS ISBN: 9783319234540
EnviroInfo
EnviroInfo
We describe an approach for doubling distribution grid capacity for connecting renewable generators based on curtailing a maximum of 5 % of the yearly energy fed into the grid on a per-generator basis. The paper contains information about the control
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::6590fd64a03b6406ec04f5ab80556bd0
https://doi.org/10.1007/978-3-319-23455-7_6
https://doi.org/10.1007/978-3-319-23455-7_6
Autor:
Benjamin Deppe, Magnus Pielke, Nasser G.A. Hemdan, Tanja Schmedes, Enno Wieben, Michael Kurrat
Publikováno v:
2015 IEEE Eindhoven PowerTech.
In the current work the implications of distribution networks reconfiguration on the system operation were investigated. Different technical issues such as voltage profiles, line loading, and On-Load Tap Changer (OLTC) were tested through the switchi