Zobrazeno 1 - 10
of 17
pro vyhledávání: '"Eko Yudo Pramono"'
Autor:
Eko Yudo Pramono, Ardylla Rommyonegge, Bambang Anggoro Soedjarno, Kevin Marojahan Banjar-Nahor, Nanang Hariyanto
Publikováno v:
IEEE Access, Vol 12, Pp 26492-26505 (2024)
Intentional physical attacks on a wide-ranging transmission network may result in load shedding or outages in the electrical grid. This vulnerability can be mitigated through modern transmission expansion planning that takes into account grid risk an
Externí odkaz:
https://doaj.org/article/b14c84d05e4d4bc4887b6e4797b0af8d
Publikováno v:
2022 5th International Conference on Power Engineering and Renewable Energy (ICPERE).
Autor:
Eko Yudo Pramono, Musthafa Abdur Rosyied, Izzuddin Fathin Azhar, Sarjiya Sarjiya, Lesnanto Multa Putranto
Publikováno v:
Journal FORTEI-JEERI. 1:29-40
PT. PLN (Persero) has planned to develop a new renewable energy which has a minimum energy mix of 23% in 2025 and 31% in 2030. An intermittent renewable energy plant, which is uncontrollable and unpredictable, will begin to be massively used. Associa
Autor:
Marwah, Febian Melwa Reksa Aditya, Eko Yudo Pramono, Edwin Nugraha Putra, Sarjiya, Lesnanto Multa Putranto
Publikováno v:
2019 11th International Conference on Information Technology and Electrical Engineering (ICITEE).
This paper analyzes the solar (PV) power plant penetration on a unique condition. Some constraints bound the maximum penetration (allowed operation) of PV. One of those boundaries is uncertainty in load profile. The uncertainty of the load profile ca
Publikováno v:
2019 IEEE 7th International Conference on Smart Energy Grid Engineering (SEGE).
Since on-grid rooftop photovoltaic (PV) installation is rapidly growing, and the interconnection requests of a new rooftop PV installation are still increasing, the improvement of PV hosting capacity of large-scale rooftop PV penetration needs to be
Autor:
Pandu Lukhyswara, Musthafa Abdur Rosyied, M Isnaini Bs, Sarjiya, Eko Yudo Pramono, Febian Melwa Reksa Aditya, Suroso Isnandar, Lesnanto Multa Putranto
Publikováno v:
2018 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC).
PT. PLN (Persero) has to develop renewable energy which has a minimum energy mix of 23% in 2025 and 31% in 2030. An intermittent renewable-energy power plant like wind and solar power plant, which is uncontrollable and unpredictable, will be massivel
Publikováno v:
2018 International Conference on Smart Green Technology in Electrical and Information Systems (ICSGTEIS).
Java-Bali grid is the largest electricity grid in Indonesia. The most recent recorded peak load of 26.834 MW occurred on October 2, 2018. Several loss of generation events have been recorded by Phasor Measurement Unit (PMU) which placed in several lo
Publikováno v:
2018 Conference on Power Engineering and Renewable Energy (ICPERE).
Java-Bali system is the biggest electricity grid in Indonesia which reaches 27.070 MW of peak load on October 17, 2018. Java island mainly interconnected by 500 kV transmission lines as the backbone and the system is chaptered onto many subsystems to
Publikováno v:
2018 International Seminar on Intelligent Technology and Its Applications (ISITIA).
Electricity is a vital energy commodity for the sake of continuity of economic circulation of the nation. Electricity in Indonesia is supplied by National Electric Company (PLN). In 2017, the need for power reached 25.670MW. To monitor and maintains
Autor:
Moh. Nur Rahman Jaya, Diana Pitaloka, Yusuf Randy Kuncoro, Eko Yudo Pramono, Adi Purwanto, Wuri Baskoro Catur Prasetyo
Publikováno v:
2018 International Seminar on Intelligent Technology and Its Applications (ISITIA).
One of the performance indicators at PT PLN (Persero) is the Average Cost (AC) of Generation. In 2017 AC was targeted at Rp. 850 / kWh, but not achieved because of higher variable costs due to less of hydro power plant production, the generator's Cap