Zobrazeno 1 - 10
of 73
pro vyhledávání: '"Ekambaram Palaneeswaran"'
Publikováno v:
Australasian Journal of Construction Economics and Building, Vol 8, Iss 2, Pp 23-29 (2012)
ISO9000-based Quality Management Systems(QMSs) have been widely applied by manycontractors with a hope to improve the productquality and hence achieve the desiredobjective of client satisfaction. However,setting up and implementing an ISO9000-based Q
Externí odkaz:
https://doaj.org/article/941e704696f942f289a2df6eaf5cc9df
Autor:
Zhu, Jiaolan, Morshed Alam, Md, Liu, Rongsheng, Wang, Jiayuan, Ding, Zhikun, Ekambaram, Palaneeswaran
Publikováno v:
In Energy & Buildings 1 April 2023 284
Autor:
Kannimuthu, Marimuthu, Raphael, Benny, Ekambaram, Palaneeswaran, Kuppuswamy, Ananthanarayanan
Publikováno v:
Engineering, Construction and Architectural Management, 2019, Vol. 27, Issue 4, pp. 893-916.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-03-2019-0156
Autor:
Bodaghi, Behrooz, Shahparvari, Shahrooz, Fadaki, Masih, Lau, Kwok Hung, Ekambaram, Palaneeswaran, Chhetri, Prem
Publikováno v:
In International Journal of Disaster Risk Reduction November 2020 50
Autor:
Szewen CHAN, Changsaar CHAI, BIBIANA LIM, Chiuyiong, EKAMBARAM, Palaneeswaran, GHANI, Mohd Khairolden Bin, Chiakuang LEE
Publikováno v:
Journal of Business & Economics Review (JBER); 2023, Vol. 8 Issue 3, p89-103, 15p
Publikováno v:
Engineering, Construction and Architectural Management, 2014, Vol. 21, Issue 1, pp. 111-126.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-04-2010-0029
Publikováno v:
Built Environment Project and Asset Management. 9:44-63
Purpose The purpose of this paper is to develop a framework to optimize time, cost and quality in a multi-mode resource-constrained project scheduling environment. Design/methodology/approach A case study approach identified the activity execution mo
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
Production Planning & Control. 29:1191-1206
Resource scheduling for emergency relief operations is complex as it has many constraints. However, an effective allocation and sequencing of resources are crucial for the minimization of the compl...
Autor:
Pauline Teo, Peter E.D. Love, Jim Smith, James Alexander, John J. Morrison, Ekambaram Palaneeswaran, Fran Ackermann
Publikováno v:
Production Planning & Control. 29:353-366
A positive association between rework and safety events that arise during the construction process has been identified. In-depth semi-structured interviews with operational and project-related employees from an Australian construction organisation we