Publikováno v:
CIB W78 Proceedings.
Autor:
Adel Francis, Edmond T. Miresco
Publikováno v:
Journal of Civil Engineering and Science. 5:1-8
The more complex a project is, the more attractive non-traditional project delivery methods like Design-Build become. These delivery methods allow decisions with several options to be postponed. To account for these alternatives, existing generalized
Publikováno v:
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law. 166:145-158
Since the late 1950s, researchers have studied the soft logic of scheduling, in particular the precedence constraint between activities used to compute the critical path. However, by proposing only external constraints and simulating work production
Autor:
Adel Francis, Edmond T. Miresco
Publikováno v:
Canadian Journal of Civil Engineering. 33:1547-1557
Generally, the utilization of traditional scheduling methods represents a complex and cumbersome task for most project managers. Using the existing tools often requires long preparation, and the quality of the graphical output of the planning job is
Autor:
Adel Francis, Edmond T. Miresco
Publikováno v:
Journal of Decision Systems. 11:383-404
Generally, the utilisation of the traditional scheduling methods represents a complex and lengthy task for most of the project managers. The existing project management software imposes often an important preparation period and the quality of graphic
Autor:
Edmond T. Miresco, Adel Francis
Publikováno v:
Computing in Civil and Building Engineering (2014).
Scheduling software used for construction projects is generally designed to plan and monitor activities and resources. These types of software allocate resources to the different activities, and allow for resource levelling, costing and cash flow cal
Autor:
Edmond T. Miresco, Claude Ngongang
Publikováno v:
Journal of Decision Systems. 8:281-305
Les logiciels de gestion de projets existants emploient principalement comme donnees d'entree la description des activites du projet, leur duree et leurs interconnexions. Independamment de la simplicite de chaque logiciel, toutes les fois ou un utili
Autor:
Adel Francis, Edmond T. Miresco
Publikováno v:
Computing in Civil Engineering (2011).
The scheduling information for complex and fast-track projects is often incomplete, and some decisions are postponed for a later date when new data is available. One solution is to propose several alternative task execution sequences, which could mit
Autor:
Edmond T. Miresco, Adel Francis
Publikováno v:
Journal of Construction Engineering and Management. 138:786-787
Autor:
Hugues Rivard, Edmond T. Miresco
Publikováno v:
Journal of Computing in Civil Engineering. 21:63-64