Zobrazeno 1 - 10
of 1 379
pro vyhledávání: '"Earned Value Method"'
Autor:
Setyagraha, Javan Agustian1 javanagustians@gmail.com, Witjaksana, Budi1 budiwitjaksana@untag-sby.ac.id, Tjendani, Hanie Teki1 hanie@untagsby.ac.id
Publikováno v:
Eduvest: Journal Of Universal Studies. Sep2024, Vol. 4 Issue 9, p7795-7805. 11p.
A Fuzzy Approach on Earned Value Method to Evaluate Project Performance in Solojebres Commuter Depot
Publikováno v:
Rekayasa Sipil, Vol 18, Iss 3, Pp 186-194 (2024)
The high level of public interest in using the Solo-Jogja commuter needs to be accompanied by an effort to improve the services and reliability of facilities, one of which is the establishment of a Commuter Depot located at Solojebres Station. In the
Externí odkaz:
https://doaj.org/article/230a6e6d2ab54932bd89e5cffa2956a2
Publikováno v:
The Spirit of Society Journal: International Journal of Society Development and Engagement, Vol 7, Iss 2 (2024)
In order to support Laga-Bauguia trade activities, the Ministry of Public Works (PU) is building a road network to the southern region. In its development, there is the development of the Laga-Bauguia Access Road which will be implemented from Februa
Externí odkaz:
https://doaj.org/article/8defaf53db944a9d9e149e0712b40324
Publikováno v:
Journal of Studies in Science and Engineering, Vol 4, Iss 1 (2024)
Today, the development of infrastructure and construction projects in developing countries is of paramount importance. Water projects, in particular, play a crucial role in advancing agriculture, industry, and the economy. The success of these projec
Externí odkaz:
https://doaj.org/article/64ba8f0954934db4898165ed7a2f12ab
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
J@ti Undip: Jurnal Teknik Industri, Vol 18, Iss 1, Pp 51-61 (2023)
Tantangan terbesar yang ada pada industri proyek konstruksi adalah menjaga kualitas mutu, biaya dan waktu proyek konstruksi. Kegiatan proyek sangat dipengaruhi oleh sistem penjadwalan dan durasi proyek. Sebagian proyek konstruksi tidak mampu mengatas
Externí odkaz:
https://doaj.org/article/edf0a91dc09143f9a9988ba83a29f4eb
Publikováno v:
Jurnal Teknik Sipil dan Perencanaan, Vol 25, Iss 1, Pp 90-99 (2023)
Along with Indonesia's economy and population growth, the community's need for building construction and infrastructure will also increase. Project implementation is undoubtedly expected to meet the predetermined quality, time, and cost targets, so a
Externí odkaz:
https://doaj.org/article/48d1afdad2fa4488849c4dd3e41f4b53
Publikováno v:
Archives of Civil Engineering, Iss No 1, Pp 169-199 (2024)
The REVM method is a modernized option of classical EVM method. The new method has been developed for applying in unstable condition of works implementation. When the works can be accidentally disturbed and the impact of random disruption factors on
Externí odkaz:
https://doaj.org/article/a501a0c25c4644979e2185be41b5b0f8
Autor:
Kasprowicz, Tadeusz1 tadeusz.kasprowicz@wat.edu.pl, Starczyk-Kołbyk, Anna2 anna.starczyk@wat.edu.pl
Publikováno v:
Archives of Civil Engineering (Polish Academy of Sciences). 2024, Vol. 70 Issue 1, p169-199. 31p.
Autor:
Gao, Shanghong
Publikováno v:
Journal of Coastal Research, 2020 Jul 01, 674-677.
Externí odkaz:
https://www.jstor.org/stable/48639829