Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Earl Dietrich"'
Publikováno v:
Day 2 Wed, September 28, 2022.
This paper highlights a case study where MPD (Managed Pressure Drilling) techniques were utilized while floating long string casings in the 10,000ft laterals in the Haynesville, saving the client more than 30-40% of rig time. The challenges encompass
Autor:
Earl Dietrich, Almas Kaidarov, Zhanna Kazakbayeva, Iain Cook, Fuad Aliyev, Harshad Patil, Andrey Magda
Publikováno v:
Day 1 Tue, November 23, 2021.
Drilling reservoir section in the oilfield located in Far North region is challenged with high risks of mud losses ranging from relatively minor losses to severe lost circulation. Numerous attempts to cure losses with traditional methods have been in
Autor:
Said Boutalbi, Harshad Patil, Svein Hovland, Earl Dietrich, Greg Matherne, Ian Knight, Rick Gonzalez, Jerib Leal
Publikováno v:
Day 3 Thu, September 23, 2021.
Until recently many of the wells on US land that were drilled using Managed Pressure Drilling (MPD) technology utilized one size fits all equipment designed for the offshore market. Since the cost and personnel requirements needed to run the offshore
Publikováno v:
Day 3 Wed, May 02, 2018.
Defining the specification and moreover the limitations of Managed Pressure Drilling (MPD) equipment installations on Mobile Offshore Drilling Units (MODU’s) could be challenging from a functionality stand point. These challenges mainly arise from
Publikováno v:
Day 1 Tue, March 28, 2017.
Technology integration is not complete without ownership. In light of the numerous challenges associated with deepwater plays all over the world, the most recent generation of ultra-deepwater drillships have more thoroughly considered the integration