Zobrazeno 1 - 4
of 4
pro vyhledávání: '"E. M. Mirzak"'
Publikováno v:
Hydrotechnical Construction. 27:501-507
1. Since the start of construction of the Boguchany hydrostation, 1184 remote transducers, which are used for monitoring the state of sections of the concrete dam and foundation during the construction period, have been installed in the concrete dam
Autor:
E. M. Mirzak, I. F. Blinov
Publikováno v:
Hydrotechnical Construction. 20:552-558
Publikováno v:
Hydrotechnical Construction. 15:360-365
1. The monitoring equipment installed in the structure made it possible to promptly check the safe operation of the dam and to obtain data on the degree of correspondence of the stress-strain state to the design assumptions. During the period from 19
Publikováno v:
Hydrotechnical Construction. 22:442-446
1. The use of analog values of the modulus of elasticity differing from the design value by not more than 0.3·104 MPa makes it possible to calculate stresses from measured strains with an error not exceeding 5%. In the case of large differences of t