Zobrazeno 1 - 10
of 17
pro vyhledávání: '"Dutch Canal"'
Autor:
Glennda Gene Luhnow, Touchin, Jewel
This report presents the results of archaeological monitoring for the installation of a new storm drain mainline, manholes, a catch basin, and various connectors in Phoenix. The monitoring was conducted by Jacobs Engineering Group Inc (Jacobs) at the
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::0230455d3cab472b65216283607c7c7c
Autor:
Darby, Connie A.
Desert Archaeology, Inc., under contract to the City of Phoenix Aviation Department (Aviation), has completed archaeological site boundary testing for the Dutch Canal Ruin, within the city-owned Consolidated Campus Building 1 property. The work was i
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::43480a91bebf309d8f4894d44202e709
Recent Investigations of the Barranca Canal at the Dutch Canal Ruin, NANT Property, Phoenix, Arizona
The results of data recovery investigations of a prehistoric canal within the city-owned NANT property are presented in this report. The canal was identified in June 2012, while boundary testing the southern limits of the prehistoric site, Dutch Cana
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::d69ad89184763a6f57aaf8aa7c011c03
Desert Archaeology, Inc., under contract to the City of Phoenix (City) Aviation Department has completed archaeological site boundary testing for the Dutch Canal Ruin, AZ T:12:62 (ASM), within the city-owned NANT property in advance of proposed Sky H
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::35a310e84eb17acdf3f229726ba99590
Autor:
Stuart, Glenn S.L.
This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::e007ab8d524e30d33f39aa5ccf02620e
Autor:
System User
This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::de23bc0e569962d3e1a5861947c01b2c
Autor:
System User
This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::01836023ad76b66ff6d4119c7f56d9b0
Autor:
A.E. (Gene) Rogge, Erickson, Kirsten
The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act of 1969 (NEPA) to evaluate potential impacts of a proposed Airport Development Program and its reasonable
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::65028e53e8de1d9da6781e8b73275598
Autor:
Fernandez, Rachel
This is the second of two volumes presenting the results of data recovery investigations at the Dutch Canal Ruin (AZ T:12:62 [ ASM]), conducted by Desert Archaeology, Inc., at the western end of the North Runway, Phoenix Sky Harbor International Airp
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::0e375e9c27d38e8e0f51605e4daeb46d
Autor:
Gentilli, Toni
The Arizona Department of Transportation (ADOT) intends to conduct a sign rehabilitation and replacement project on Interstate 10 (1-10) from milepost (MP) 145.5-156.3 in the cities of Phoenix and Tempe, Maricopa County, Arizona (Figure 1). In additi
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::8cb3d22eecc00f5075df46743ac152d2