Zobrazeno 1 - 10
of 27
pro vyhledávání: '"Duff, Roy"'
Publikováno v:
Engineering, Construction and Architectural Management, 2013, Vol. 20, Issue 5, pp. 505-521.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-01-2012-0002
Autor:
Gibb, Alistair, Hide, Sophie, Haslam, Roger, Gyi, Diane, Pavitt, Trevor, Atkinson, Sarah, Duff, Roy
Publikováno v:
Journal of Engineering, Design and Technology, 2005, Vol. 3, Issue 1, pp. 12-23.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/17260530510815303
Autor:
Cameron, Iain1 (AUTHOR) i.cameron@gcal.ac.uk, Duff, Roy2 (AUTHOR)
Publikováno v:
Construction Management & Economics. Aug2007, Vol. 25 Issue 8, p869-881. 13p. 5 Charts, 1 Graph.
Autor:
Cameron, Iain1 (AUTHOR), Duff, Roy2 (AUTHOR) roy.duff@umist.ac.uk
Publikováno v:
Construction Management & Economics. May2007, Vol. 25 Issue 5, p495-508. 14p. 3 Diagrams.
Existing research which has attempted to determine differences between the costs of the different procurement routes has consistently aimed to determine a single figure for the difference for projects as a whole. No attempt has been made to provide a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od______2295::af3ed2e56ad2999d19bdaf1e9edfe6f6
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:2e159
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:2e159
Neural networks are information processing systems that can automate semi-structured knowledge domains. Neural networks complement and enhance the capabilities of conventional systems in order to increase productivity in a given domain. Research into
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od______2295::380c1a848000fa12e12d0cbbcd0dbf5e
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243812
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243812
Existing research that has attempted to determine differences between the costs of following different procurement routes has consistently aimed to determine a single blanket figure, such as “design and build is 15% cheaper than traditional”. No
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od______2295::022598301e85457e62446bac33d25d1c
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243816
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243816
Existing research which has attempted to determine differences between the costs of the different procurement routes has consistently aimed to determine a single figure for the difference for projects as a whole. No attempt has been made to provide a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od______2295::e8510a50db58ce434826efa9f08bf663
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243809
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243809
The impact of technology on all areas of science and industry in the latter half of the twentieth century has been enormous, and the building industry has been no exception. However, early stage cost estimation has been little affected by these advan
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od______2295::84375253a124f6e1ef618673f8a21236
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243819
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243819
The choice of procurement system for a building project is a very significant one. However, there is currently very little comparative cost data to inform the selection of procurement system, especially the total cost to the client. This paper report
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od______2295::7e5f5bf13d51d9c1defaa94b7d746416
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243810
http://www.manchester.ac.uk/escholar/uk-ac-man-scw:243810