Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Dmytro Viktorovych Ryndiuk"'
Publikováno v:
Journal of Mechanical Engineering, Vol 23, Iss 4, Pp 22-28 (2020)
In the regulatory documents of the Ministry of Energy and Coal Industry of Ukraine, the beyond-design operating life of the high-energy equipment of 220 MW power units is limited to the operating life of 220 thousand hours and 800 start-ups. To date,
Publikováno v:
Energy Technologies & Resource Saving. :56-62
Modernization of sealing units with a change of design is carried out in order to improve the technical and economic parameters of steam turbines. It is known from experience of operation of the turbine equipment that, ring cracks in rotors arise in
Publikováno v:
Journal of Mechanical Engineering, Vol 23, Iss 3, Pp 8-15 (2020)
200 MW steam turbines of DTEK Lugansk TPP units have operated for about 305–330 thousand hours with a total number of starts from 1.438 to 1,704, as of the end of 2019. The term for extending the operation of high-temperature power equipment betwee
Publikováno v:
Науковий журнал «Енергетика: економіка, технології, екологія»; № 3 (2018): Енергетика: економіка, технології, екологія; 132-138
POWER ENGINEERING: economics, technique, ecology; № 3 (2018): Power engineering: economics, technique, ecology; 132-138
POWER ENGINEERING: economics, technique, ecology; № 3 (2018): Power engineering: economics, technique, ecology; 132-138
На поточному етапі енергетичного розвитку України, політика продовження експлуатації атомних електричних станцій потребує встановлен