Zobrazeno 1 - 10
of 12
pro vyhledávání: '"Dirta Marina Chamelia"'
Publikováno v:
Research Journal of Applied Sciences. 13:26-33
Publikováno v:
Jurnal Teknik ITS. 8
Kegiatan eksplorasi minyak dan gas di laut membutuhkan fasilitas anjungan lepas pantai khususnya berupa struktur terapung, karena dapat berpindah tempat sesuai kebutuhan. Salah satu rangkaian pekerjaan untuk memproduksi struktur lepas pantai tersebut
Publikováno v:
Applied Mechanics and Materials. 862:315-320
The development process of jacket structure is not always in accordance with the planned schedule in advance. Many factors affect the planning failure, among others, the time or the planned schedule, budgeted costs, equipment and material needed, the
Publikováno v:
Applied Mechanics and Materials. 862:321-325
Internal fluid flow can affect a vibration on the dog leg subsea pipeline due to bend in the pipe structure. This study was done by varying fluid speeds which flows inside of piping system to obtain a pipe safety limitation due to internal flow. The
Publikováno v:
Applied Mechanics and Materials. 836:317-322
Offshore platforms are used worldwide for drrilling, proceesing and even storage purposes. The offshore platforms can be fixed to the seabed, or can be float. The fixed platform namely jacket structure is a complex construction and design. Constructi
Autor:
Silvianita, Widi Agoes Pratikto, Muhammad Iqbal Maulana, Wetta Inggrid Sari, Sholihin, Rendatiyarso Laksono, Dirta Marina Chamelia, Suntoyo, Kriyo Sambodho, Raditya Danu Riyanto
Publikováno v:
Proceedings of the 7th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management.
Publikováno v:
Proceedings of the 6th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management.
Publikováno v:
Procedia Earth and Planetary Science. 14:220-227
This paper presents mooring system analysis on submerged floating tunnel (SFT) with a number of mooring configurations and the influence of mooring angle variations to its dynamic response. Working loads considered on the tunnel are current and wave
Publikováno v:
IOP Conference Series: Earth and Environmental Science. 135:012014
Publikováno v:
IOP Conference Series: Earth and Environmental Science. 135:012026
The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum resul