Ronny Durrotun Nasihien, Diah Ayu Restuti Wulandari, Achfas Zacoeb, Harimurti Harimurti, M. Ikhsan Setiawan
Publikováno v:
Jurnal Darussalam: Jurnal Pendidikan, Komunikasi dan Pemikiran Hukum Islam, Vol 9, Iss 1, Pp 153-175 (2017)
Pertanian Perkotaan (Urban Farming) memanfaatkan intensifikasi lahan, guna memenuhi kebutuhan sayuran dan buah segar sehari-hari bagi masyarakat pemukiman/perumahan di perkotaan. Teknologi Portable inflated Greenhouse sebagai fasilitas pendukung prod
Externí odkaz:
https://doaj.org/article/20e6d892a2dc432baa3223f5e6b9212c
Publikováno v:
Neutron. 22:99-103
In the matter of parking lot problems, there are many ways to solve the problems that always arise from the parking lot with more and more and require a very large land with adequate capacity, therefore one of them is by making a multi-storey parking
Publikováno v:
ADRI International Journal of Civil Engineering. 5:9-22
Performance requirements project is the good of the products, who reached the cost and time in the possible lower of the plan.An approach to condition of ideal performance evaluation done as in the construction of the building type b1 ((basement area
Publikováno v:
International Journal of Engineering, Science and Information Technology. 2:136-141
Safety and accidents at work are the most serious thing to note, on building projects stroke center at Haji Hospital of Surabaya is still a lot of workers are less aware and less understanding about the safety and accidents caused due to neglect of t
Publikováno v:
NAROTAMA JURNAL TEKNIK SIPIL. 5:46-53
Salah satu penentu ketepatan waktu pada proyek adalah produktivitas, Salah satu hal yang bisa dilakukan untuk mengukur tingkat produktivitas adalah dengan meneliti bersarnya tingkat faktor utilitas pekerja (LUR), Tujuan dari penelitian ini adalah unt
Publikováno v:
Neutron. 21:20-26
Project development and how to control time and costs in the construction project of a public junior high school 1 Surabaya. This research was conducted with the aim of knowing and comparing the amount of duration and cost after acceleration by using
Publikováno v:
Neutron. 21:27-32
The complex problems that existed during the Field Implementation in the SMP Negeri 1 Surabaya project at that time caused some work that was not as planned both in terms of time, quality and cost which resulted in overbudget and overtime. When exper
Publikováno v:
International Journal of Engineering, Science and Information Technology. 1:1-6
Concrete is a composite building material made from a combination of aggregate and cement. The limitation of concrete material, in this case, is a fine aggregate (river sand). The utilization of sea sand as an alternative to fine aggregate in the man
Publikováno v:
International Journal of Engineering, Science and Information Technology. 1:91-94
Project for the construction of the Gunungsari Banjar Sugihan - Kandangan diversion channel, Surabaya, in the implementation of this project there was a delay in how many works. One way to anticipate this delay is by accelerating it using the Time Co
ANALYSIS AND DESIGN OF DRAINAGE SYSTEM PLANNING STUDY (CASE STUDY GRAHA WISATA SIDOARJO RESIDENTIAL)
Publikováno v:
IJEEIT : International Journal of Electrical Engineering and Information Technology. 2:33-40
Graha Wisata Sidoarjo Housing has a land area of 470,000 m2 located in Lebo Village, Sidoarjo District, Sidoarjo Regency. The housing is passed by the Anak Afvoer Sidokare channel. With the change in land function, it is necessary to analyze the capa