Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Develle, Kevin"'
Autor:
Andreassen, Odd, Charrondière, Cedric, Develle, Kevin, Rijllart, Adriaan, Rossel, Ralf, Steen, Joergen, Tagg, Joseph, Zilliox, Thomas
Successful integration of industrial equipment in the CERN accelerator complex relies mainly on 3 key components. The first part is the Controls Middleware (CMW). That provides a common communication infrastructure for the accelerator controls at CER
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::abf96b1f40eb8fb3ba8206432e09a964
For distributed data acquisition and control system, clock synchronization between devices is key. The internal CPU clock of a CompactRIO has an accuracy of 40 ppm at 25 degree Celsius, which can cause up to 3 sec of drift per day. To compensate for
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c9bd6ea0c9ae37974c8cfe116f20178f
Autor:
Freddi, Emanuele, Andreassen, Odd, Develle, Kevin, Lahaye, Joel, Matasaho, Iikka, Rijllart, Adriaan
Particle accelerators are complex machines with fast and high power absorption peaks. Power quality is a critical aspect for correct operation. External and internal disturbances can have significant repercussions causing beam losses or severe pertur
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::cc5fdbea95ac6d44c307e826e9c87dc2
The civil engineering activities in the framework of the High Luminosity LHC project, the Geneva GEothermie 2020 and the continuous monitoring of the LHC civil infrastructures triggered the need for the installation of a seismic network at CERN. A 24
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::ec2796844741ef5a3f6056721b156190
http://cds.cern.ch/record/2305515
http://cds.cern.ch/record/2305515
CERN MEDICIS is a research facility that will make radioisotopes for medical applications using the primary proton beam at ISOLDE. It will start operating later in 2017. The high level application for the new beam line is responsible for the control
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::6f498fb5f1cb66dac213f8379e56f21c
http://cds.cern.ch/record/2305501
http://cds.cern.ch/record/2305501
Autor:
Guinchard, Michael, Cabon, Morgane, Charrondière, Cedric, Develle, Kevin, Fessia, Paolo, Lacny, Lukasz, Osborne, John, Scislo, Lukasz, Wenninger, Jorg
HL-LHC requires the excavation of large underground infrastructures in order to host new equipment. The tunnel shall be ready for installation for LS3 (2022) and therefore its construction shall take in place in parallel with the LHC exploitation. Ef
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::ceddc1ac03c67c93ad9fc0c99431e937
http://cds.cern.ch/record/2672524
http://cds.cern.ch/record/2672524