Zobrazeno 1 - 10
of 89
pro vyhledávání: '"Dennis, J. H."'
Publikováno v:
IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems. 42:164-177
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
British Journal of Industrial Medicine, 1990 Jun 01. 47(6), 405-410.
Externí odkaz:
https://www.jstor.org/stable/27727009
Autor:
Charles J. Alpert, Dennis J.-H. Huang, Tony F. Chan, Igor L. Markov, Andrew Caldwell, M. S. Moroz, Andrew B. Kahng
Publikováno v:
VLSI Design, Vol 10, Iss 1, Pp 99-116 (1999)
The top-down “quadratic placement” methodology is rooted in such works as [36, 9, 32] and is reputedly the basis of commercial and in-house VLSI placement tools. This methodology iterates between two basic steps: solving sparse systems of linear
Publikováno v:
IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems. 16:1199-1205
Iterative improvement partitioning algorithms such as the FM algorithm of Fiduccia and Mattheyses (1982), the algorithm of Krishnamurthy (1984), and Sanchis's extensions of these algorithms to multiway partitioning (1989) all rely on efficient data s
Publikováno v:
9th IET International Conference on Advances in Power System Control, Operation and Management (APSCOM 2012).
In a power system network, voltage dip is regarded as the most common power quality (PQ) issue. In general, the causes of voltage dips are mainly due to uncontrollable factors such as lightning, third party interference and system faults. Nowadays, m
Autor:
Dennis J. H. Lin, W.Y. Chu
Publikováno v:
8th International Conference on Advances in Power System Control, Operation and Management (APSCOM 2009).
As the largest supplier of electricity in Hong Kong, CLP Power Hong Kong Ltd. (CLPP) generates and supplies electricity to Kowloon, the New Territories, Lantau and most of the outlying islands of Hong Kong, covering an area of about 1,000 sq. km., an
Publikováno v:
8th International Conference on Advances in Power System Control, Operation and Management (APSCOM 2009).
Pole-mounted switches with automation are widely employed at critical locations of CLP Power (CLPP)'s 11 kV overhead line system. It could help reduce Customer Minutes Lost (CML) in terms of shortening fault location time and hence faster supply rest
Autor:
W.Y. Chu, Dennis J. H. Lin
Publikováno v:
7th IET International Conference on Advances in Power System Control, Operation and Management (APSCOM 2006).
As the largest supplier of electricity in Hong Kong, CLP Power Hong Kong Ltd., (CLPP) generates and supplies electricity to the Kowloon Peninsula, the New Territories and most of the outlying islands in Hong Kong, covering an area of about 1,000 sq.
Publikováno v:
DAC
Hong Kong University of Science and Technology
Hong Kong University of Science and Technology
The "quadratic placement" methodology is rooted in [Module Placement Based on Resistive Network Optimization, Proud: A Sea-Of-Gate Placement Algorithm, A Combined Force and Cut Algorithm for Hierarchical VLSI Layout]and is reputedly used in many comm