Zobrazeno 1 - 10
of 11
pro vyhledávání: '"Deepak Manilal Gala"'
Publikováno v:
Journal of Petroleum Technology. 62:24-27
Technology Update As the “low-hanging fruit” of the world’s oil and gas accumulations are more fully harvested, so the industry has been forced into tackling more complex and challenging projects such as ultradeep prospects, deepwater applicati
Autor:
Budi Utama, Liao Jianhua, Jinxiang Li, Keith Hillis, Deepak Manilal Gala, Zhao Chao, Steven Michael Rosenberg
Publikováno v:
SPE Drilling & Completion. 25:96-101
Summary The Banuwati field offshore southeast Sumatra, Indonesia, presents major challenges to both drilling and liner running operations because of the problematic lower Baturaja limestone formation, which is a carbonate reef structure known for sev
Publikováno v:
The Way Ahead. :12-14
Tech 101 - The basics of managed pressure drilling. In his book The Nature of Technology, W. Brian Arthur remarked, “The story of this century will be about the clash between what technology offers and what we feel comfortable with.” Although Art
Publikováno v:
All Days.
Liner drilling technology provided an effective solution to hole instability issues seen while drilling with conventional methods through a narrow mud weight/pore pressure/fracture gradient window laden with depleted intervals and virgin pressured sh
Publikováno v:
All Days.
It is increasingly difficult to find hydrocarbon reserves located in benign environments, a situation which has resulted in the oil and gas industry moving to locations where significant drilling challenges are encountered. These challenges often lea
Publikováno v:
All Days.
Conventional drilling techniques proved problematic when employed in a well in the Gulf of Mexico shelf, causing the well to exhibit severe lost circulation (~25 barrels per hour) and wellbore ballooning in the interval at 10,700 ft MD. After a detai
Publikováno v:
All Days.
This paper details the lessons learned in late 2007 and early 2008 whilst air drilling vertical gas wells in the Travis Peak formation of the western East Texas deep Bossier play in Amoroso Field and applying the lessons learned in the US to a deep a
Publikováno v:
All Days.
The combination of liner drilling with a casing while drilling (CWD) bit to successfully drill and cement a 7-in. liner in place through a severe loss zone in the Gulf of Mexico, offshore Texas, USA, will be presented in this paper. Previous attempts
Publikováno v:
All Days.
This paper details the modifications performed and knowledge gained in late 2007 and early 2008 while drilling three underbalanced (UB) vertical gas wells in the Travis Peak formation of the western east Texas deep Bossier play in the Amoroso field,
Autor:
James Dodson, Budi Utama, David M. Prichard, Deepak Manilal Gala, Steven Michael Rosenberg, Ted Dodson, Patrick L. York
Publikováno v:
All Days.
Abstract Cost overruns can easily manifest during well construction due to unexpected issues including lost returns, differential sticking, and narrow pore pressure/fracture gradients. To better plan for potential overruns, operators sometimes earmar