Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Davy Maes"'
Autor:
Sam Weckx, Bart Meyers, Jeroen Jordens, Steven Robyns, Jonathan Baake, Pieter Lietaert, Roeland DeGeest, Davy Maes
Publikováno v:
IET Collaborative Intelligent Manufacturing, Vol 4, Iss 2, Pp 112-122 (2022)
Abstract In this work, we present a cloud‐based digital twin for monitoring of a clamping technology for machining of composite parts. Supporting large and/or freeform composite parts is crucial to avoid bending during drilling. Bending of the part
Externí odkaz:
https://doaj.org/article/bb75cc05fb6445bcb6f77b9b33714169
Autor:
Bart Meyers, Johan Van Noten, Pieter Lietaert, Bavo Tielemans, Hristo Hristov, Davy Maes, Klaas Gadeyne
Publikováno v:
IFAC-PapersOnLine. 55:13-18
Autor:
Sam Weckx, Steven Robyns, Jonathan Baake, Edward Kikken, Roeland De Geest, Merwan Birem, Davy Maes
Publikováno v:
Procedia Computer Science. 200:227-236
Publikováno v:
2022 Annual Modeling and Simulation Conference (ANNSIM), 18-20 July, 2022, San Diego, California, USA
The engineering processes for the design of Cyber-Physical Systems (CPS) are often suboptimal due to - among others - inefficient collaboration between the involved engineering domains. This may lead to increased development time and cost, oversized
Publikováno v:
2018 IEEE 18TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE (PEMC)
Optimization of total cost of ownership (TCO) is an important, and challenging design target for present day manufacturing machines. This paper is concerned specifically with production machines with fast reciprocating loads $(> 1 \mathbf{Hz})$ , e.g
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::51be84566abd4c2c261c7d4710e5e7ee
https://lirias.kuleuven.be/handle/123456789/626337
https://lirias.kuleuven.be/handle/123456789/626337
Publikováno v:
ICSME
In today's engineering projects, companies continuously have to adapt their systems to changing customer or market requirements. This requires a flexible, iterative development process in which different parts of the system under construction are bui