Zobrazeno 1 - 10
of 19
pro vyhledávání: '"Davoud Sedighizadeh"'
Publikováno v:
IET Smart Cities, Vol 4, Iss 1, Pp 56-77 (2022)
Abstract An optimal day‐ahead operation of a microgrid (MG) based on an energy hub (EH) that is an industrial building, is presented in this paper. The proposed EH includes wind turbine (WT), photovoltaic (PV), triple generation that is combined co
Externí odkaz:
https://doaj.org/article/f7afc36741eb4356b933d84772c706dd
Publikováno v:
Alexandria Engineering Journal, Vol 57, Iss 4, Pp 2225-2239 (2018)
The vehicle routing problem is the basic problem of distribution planning which seeks to find the best route with minimum displacement cost considering the number of customers, their constraints, and number and capacity of the available vehicles. In
Externí odkaz:
https://doaj.org/article/6f642a7592c54d26a20041a926a0bd6a
Publikováno v:
International Journal of Supply and Operations Management, Vol 2, Iss 1, Pp 569-594 (2015)
Regarding the large number of developed Particle Swarm Optimization (PSO) algorithms and the various applications for which PSO has been used, selecting the most suitable variant of PSO for solving a particular optimization problem is a challenge for
Externí odkaz:
https://doaj.org/article/96ffee7d85ed4908bc7d47f834480908
Publikováno v:
Mathematics and Computers in Simulation. 179:194-212
Particle Swarm Optimization (PSO) algorithm is a nature-inspired meta-heuristic that has been utilized as a powerful optimization tool in a wide range of applications since its inception in 1995. Due to the flexibility of its parameters and concepts,
Publikováno v:
International Journal of Electrical Power & Energy Systems. 135:107477
With the development of human societies, new industries and needs are being formed which supplying their power and energy consumption, requires the development of equipment and infrastructure in the field of power generation and transmission. An exam
Publikováno v:
Alexandria Engineering Journal, Vol 57, Iss 4, Pp 2225-2239 (2018)
The vehicle routing problem is the basic problem of distribution planning which seeks to find the best route with minimum displacement cost considering the number of customers, their constraints, and number and capacity of the available vehicles. In
Publikováno v:
Electric Power Systems Research. 201:107527
In this paper, two- stage operation of a grid-connected microgrid (GCMG) with high penetration rate of renewable energy sources (RESs) and electric vehicles (EVs) is presented based on day-ahead and real time energy markets, where GCMG follows multi-
Publikováno v:
International Journal of Electrical Power & Energy Systems. 131:107092
Energy Hub (EH) is known as a complex system capable of transferring, conversion, and saving various energies in a Microgrid (MG). An important issue for investors is taking the advantage of EH for optimal management of all energy carriers, particula
Publikováno v:
Thermal Science and Engineering Progress. 24:100955
Using poly-generation schemes based on energy hub (EH) concepts is one of the new ways to efficiently supply energy (electrical/thermal/cooling/water) demanded by smart buildings equipped with building energy management system (BEMS). Regarding sever
Autor:
Davoud Sedighizadeh, Ellips Masehian
Publikováno v:
Journal of Zhejiang University SCIENCE C. 11:607-619
Two new heuristic models are developed for motion planning of point robots in known environments. The first model is a combination of an improved particle swarm optimization (PSO) algorithm used as a global planner and the probabilistic roadmap (PRM)