Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Daoming DENG"'
Autor:
Yufei WAN, Daoming DENG, Liwan LI, Chunyu LIU, Lin CHENG, Bingyue WANG, Zhengwen CHEN, Yan HUANG
Publikováno v:
You-qi chuyun, Vol 40, Iss 3, Pp 339-345 (2021)
In actual operation, the pigging period of wet-gas pipeline should be determined by some methods to guarantee the efficiency of pipeline transportation. In order to study the adaptability of common determination methods for pigging cycle of wet-gas p
Externí odkaz:
https://doaj.org/article/2e03ae23ba93491e8582cfd6eca8f927
Publikováno v:
You-qi chuyun, Vol 39, Iss 10, Pp 1109-1115 (2020)
The normal operation of natural gas gathering and transportation system is strongly affected by the liquid accumulation in pipelines, a common phenomenon in gas field development. Available prediction of liquid accumulation is helpful to take timely
Externí odkaz:
https://doaj.org/article/26a97de911dc4d8387c3df26a1e204c2
Publikováno v:
Petroleum Science and Technology. 31:1933-1939
A series of experiments on air/water two-phase flow in a flowline riser have been performed. The riser has a free-standing form (7 m high) with the flowline of a 2° downward inclination toward the riser-base. Severe slugging flows are described in t
Publikováno v:
Journal of Petroleum Science and Engineering. 101:28-34
In the simulation of waxy oil–gas pipeline multiphase flow, the physical parameters and rheological properties of the multiphase fluid are the sensitivity functions of the temperature. The precise temperature distribution of multiphase fluid is the
Publikováno v:
Volume 4: Production Pipelines and Flowlines; Project Management; Facilities Integrity Management; Operations and Maintenance; Pipelining in Northern and Offshore Environments; Strain-Based Design; Standards and Regulations.
Fengcheng Heavy Oil Block in Xinjiang Oilfield is located on the northeastern part of northwestern Junggar basin in China, and approximately 120 km and 400 km off Karamay City and Urumqi City respectively. In this Block there is conventional heavy oi
Publikováno v:
2010 8th International Pipeline Conference, Volume 4.
The first West-East Gas Pipeline, running from the Tarim Basin gas fields in Xinjiang to the Yangtze River Delta area in China, is an 1016-mm-dia, 3900-km-long pipeline, the design capacity and pressure of which are 12 billion cubic meters annually a
Autor:
Jing Gong, Daoming Deng
Publikováno v:
2008 7th International Pipeline Conference, Volume 4.
For the rich gas transfer schemes, extraction of NGL from the natural gas is not required in the oil field or gas condensate field, so the gas treatment processes in the field is simplified and the expense from the storage and transportation of NGL i
Autor:
Daoming Deng, Jing Gong
Publikováno v:
Volume 1: Project Management; Design and Construction; Environmental Issues; GIS/Database Development; Innovative Projects and Emerging Issues; Operations and Maintenance; Pipelining in Northern Environments; Standards and Regulations.
Transporting natural gas and gas condensate in a long distance pipeline occurs frequently during the development of offshore or desert gas condensate and/or oil fields. However, the thermohydraulic calculation of gas-condensate pipeline, especially t