Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Daodu Olugbenga"'
Autor:
Emesi John, Okoro Chidi, Osuagwu Michael, Daodu Olugbenga, Fasasi Roseline, David Olayinka, Adebayo Adejoke
Publikováno v:
All Days.
The GBN NAG reservoir development project is part of the GBNRC Phase 1-6 project which involves the development of 6 wells with the potential to deliver additional 410MMscf/d to the GBNRC export gas market. The wells were drilled with heavily weighte
Publikováno v:
Day 2 Tue, August 01, 2017.
The essence of reservoir simulation is to forecast field performance, ultimate recovery and to evaluate the effects of different operational conditions on recovery while keeping the economics of each scenario in view. It is important to note that in
Publikováno v:
Day 3 Wed, August 02, 2017.
Gas reservoir development at inception is often linked to detailed surface infrastructure development and long term contractual agreements with only a few appraisal wells. A thorough and detailed technical estimation of the size of the pie is an impo
Publikováno v:
Day 2 Tue, August 01, 2017.
Acquisition of bottom hole pressure is a statutory requirement in Nigeria. In addition, pressure data provide a better understanding of reservoir responses to production for effective wells, reservoirs and facilities management. The data is used to c
Autor:
Okereke Onyedikachi, Ifeanyi-Onah Florence, Nweze C Onuigbo, Imaobong Bassey, Taiwo Bamidele, Leo Chiejina, Egwim Stella, Ebogomo Noah, Daodu Olugbenga, Kalu Igban, Sedqwick M. Adam, Nnamdi L. Abuah
Publikováno v:
Day 3 Wed, August 02, 2017.
Beta Integrated Oil and Gas plant is the major supplier of domestic gas to the Lima power plant which provides 16% of the available power to the Nigerian national grid. Efforts are made to ensure that down times in the plant are reduced because of th
Autor:
Daodu Olugbenga, Waazor Korubo, Wumi lledare, Anthony Johnson, Bakare Olatunji, Chioma Ebeh, Uche Nwachinemere, Ikwan Ukauku
Publikováno v:
Day 2 Tue, August 01, 2017.
Flowing Material Balance (FMB) and Rate Transient Analysis (RTA) have evolved as well and reservoir performance evaluation techniques which make use of the large amount of pressure data from permanent downhole gauge (PDHG). Meaningful analysis requir