Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Daniele Stocker"'
Publikováno v:
Engineering, Vol 4, Iss 2, Pp 235-248 (2018)
This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the flat railway line crossing the Swiss Alps from north to south. The project consisted of a twi
Externí odkaz:
https://doaj.org/article/afc96659c94c422da1bbfdfa6ccf98de
Publikováno v:
Engineering, Vol 4, Iss 2, Pp 235-248 (2018)
This paper summarizes the experience that was gained during the construction of the 15.4 km long Ceneri Base Tunnel (CBT), which is the southern part of the flat railway line crossing the Swiss Alps from north to south. The project consisted of a twi