Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Daniel Przywara"'
Autor:
Daniel Przywara, Adam Rak
Publikováno v:
Applied Sciences, Vol 11, Iss 4, p 1357 (2021)
The Planning and implementation of construction projects are difficult processes and are burdened with many risk elements. The budget spread over time, which is developed on the basis of the schedule, presents the expected distribution of costs throu
Externí odkaz:
https://doaj.org/article/99a86b0da2f84460be3bc77199234a0f
Autor:
Daniel Przywara, Adam Rak
Publikováno v:
Lecture Notes in Civil Engineering ISBN: 9783031268786
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9e0672959646dc2fa38593c21213add6
https://doi.org/10.1007/978-3-031-26879-3_24
https://doi.org/10.1007/978-3-031-26879-3_24
Autor:
Adam Rak, Daniel Przywara
Publikováno v:
Applied Sciences
Volume 11
Issue 4
Applied Sciences, Vol 11, Iss 1357, p 1357 (2021)
Volume 11
Issue 4
Applied Sciences, Vol 11, Iss 1357, p 1357 (2021)
The Planning and implementation of construction projects are difficult processes and are burdened with many risk elements. The budget spread over time, which is developed on the basis of the schedule, presents the expected distribution of costs throu
Autor:
Daniel Przywara, Adam Rak
Publikováno v:
MATEC Web of Conferences, Vol 174, p 04005 (2018)
Records of the national, average pay rates in the construction industry, at quarterly intervals, allow cost - planning departments of contractors and investment services to assess current market conditions in the construction industry. Price quarterl
Autor:
Daniel Przywara, Adam Rak
Publikováno v:
Czasopismo Techniczne. 5
Autor:
Adam Rak, Daniel Przywara
Publikováno v:
Open Journal of Architectural Design. 2:1
The subject of the thesis is the main schedule of the investment cycle based on the two-point relation net of CPM. In the thesis, the analysis of technological regime of net buffers has been made with the special attention to the possibility of locat