Zobrazeno 1 - 10
of 11
pro vyhledávání: '"Daniel Beaman"'
Publikováno v:
Day 1 Mon, October 31, 2022.
This paper highlights the successful installation of a MultiLateral Technology (MLT) for the first time in an offshore field 40 km from Abu Dhabi. It will document the deployment of the deepest cemented MLT Level 5 globally, with improvements in well
Autor:
Javier Torres, Ahmed Abdelrahim Abdelrahman, Scott Wagstaff, Yousef Ahmed Alhammadi, Daniel Beaman, Yousif Al Katheeri
Publikováno v:
Day 3 Thu, May 27, 2021.
For several decades, completion design has been performed by the Field Development (FD) Team of several offshore fields in Abu Dhabi and installed with minimal Completion Engineering Team contribution. The demand of lower completion requirement has b
Autor:
Sultan Dahi Al-Hassani, Daniel Beaman, Osama Mohamed Keshtta, Bader Saif Al-Badi, Abdel Mouez M. Sabri, Yann Bigno, Elyes Draoui, Simona Grifantini, Talha Saqib
Publikováno v:
Day 2 Tue, November 10, 2020.
Field presented here is located in the southern part of the Arabian Gulf approximately 135 km north-west of Abu Dhabi city. This giant heterogeneous carbonate field consists of multi-stacked reservoirs. The presented reservoir is highly fractured, it
Autor:
Ahmed Abubaker Al-Harbi, Leonque Rondon, Subrata Sanyal, Ben Butler, Maher Zidan, Eglier Yanez Hernandez, Abhay Mudgal, Amnah Al-Sereidi, Al Anoud Al-Shamsi, Daniel Beaman
Publikováno v:
Day 1 Mon, November 09, 2020.
The challenges of high heterogeneous multi-layer reservoirs were a driver for ADNOC to establish new well completion requirements. Based on this, the well completion strategy was revised in order to improve the completion design for a Dual Oil Produc
Autor:
Bhagwan D. Bansal, Abdel Mouez M. Sabri, Bader Saif Al-Badi, Simona Grifantini, Osama Mohamed Keshtta, Elyes Draoui, Talha Saqib, Daniel Beaman, Yann Bigno, Sultan Dahi Al-Hassani
Publikováno v:
Day 2 Tue, November 10, 2020.
The giant heterogeneous carbonate field presented here consists of multi-stacked reservoirs and is located in the Arabian Gulf approximately 135 km north-west of Abu Dhabi. The reservoir named "T" measures 9 km by 11.5 km, with large accumulation of
Autor:
Olla Kadoura, Eglier Yanez Hernandez, Rail Salimov, Maher Zidan, Mohamed Al Zaabi, Yousif Al Katheeri, Knut Nes, Osama Saeed, Mattheus Uijttenhout, Ahmed Al Harbi, Yousef Al Hammadi, Najem Qambar, Javier Torres, Elyes Draoui, Usama Ghauri, Daniel Beaman, Jawad Ismail
Publikováno v:
Day 1 Mon, November 11, 2019.
An integrated and collaborative study was required in order to determine the most cost effective field development scenario while ensuring collision risk mitigation, to define and validate the well planning and slot allocation for the wells scheduled
Publikováno v:
Day 3 Wed, November 13, 2019.
The Extended Reach Drilling (ERD) field re-development of a giant offshore field in United Arab Emirates (UAE) from four artificial islands predominantly requires the use of artificial lift (gas lift) to assist in unloading the wells post-completion
Autor:
Yousef Al Hammadi, Javier Torres, Tetsuro Takanishi, Adel Al Marzouqi, Samaawi Moslim, Ameen Al-Kasasbeh, Fahed Al Ameri, Mohamed Al Zaabi, Nobuaki Mukai, Takahiro Toki, Mario Oviedo, Islam Khaled AbdelKarim, Awais Warraich, Ahmed Al Harbi, Salim Al Ali, Daniel Beaman, Prashant Gohel, Ahmed Ibrahim, Ali Eissa Al Mahri, Yousif Al Katheeri
Publikováno v:
Day 1 Mon, October 21, 2019.
Driving efficiency to ensure cost and risk reduction in well operations is paramount for any operating company; to achieve this, the main objective was to implement a continuous improvement process that measures performance to then improve it, acquir
Publikováno v:
Day 2 Tue, November 13, 2018.
This Extended Reach Drilling (ERD) field re-development predominantly from four artificial islands of a giant offshore field in the United Arab Emirates (UAE) requires in most cases extremely long laterals in order to reach the defined reservoir targ
Publikováno v:
Day 2 Tue, November 14, 2017.
This development predominantly from four artificial islands of a giant offshore field in the United Arab Emirates (UAE) requires isolation of the reservoir during deployment of advanced ERD upper completions. This methodology to isolate the reservoir