Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Dan Bobrow"'
Autor:
Camilo Marulanda, Dan Bobrow, David L. Druss, Youssef M. A. Hashash, Prabir K. Das, Kyle A. Kershaw, Edward J. Cording
Publikováno v:
Journal of Geotechnical and Geoenvironmental Engineering. 129:495-505
Braced excavations for the Central Artery/Tunnel project in Boston, Mass. include several instrumented sections for monitoring excavation and ground response to soil removal and strut installation. Strain in the struts is measured using thermally mat
Publikováno v:
Geotechnical Engineering for Transportation Projects.
Groundwater control during cut-and-cover tunnel construction of a half-mile segment of the Central Artery I-93 Northbound Tunnel requiring excavation to more than 100 feet below ground surface resulted in temporary depression of the groundwater and s