Zobrazeno 1 - 10
of 42
pro vyhledávání: '"DEMATEL analysis"'
Publikováno v:
Journal of Management Science and Engineering, Vol 9, Iss 3, Pp 328-347 (2024)
Complex equipment refers to special equipment that differs from general equipment. The collaborative development work of complex equipment in the military-civilian integration context involves numerous suppliers. We consider a two-tier supply network
Externí odkaz:
https://doaj.org/article/6d3f9901887d4334a5402da2cd011f17
Publikováno v:
Ain Shams Engineering Journal, Vol 15, Iss 7, Pp 102756- (2024)
Risk identification and prioritization in production sector is critical if an enterprise wishes to compete successfully. To achieve this, Delphi technique was utilized to finalize 36 identified risks in a ‘metal plate production’ stage prior to r
Externí odkaz:
https://doaj.org/article/7964fcd29ec54766a82c6a5736ab770d
Publikováno v:
Systems, Vol 12, Iss 9, p 379 (2024)
Marxist political economy provides a theoretical framework for sustainable supply chains, while the implementation of sustainable supply chains embodies and deepens the practical application of Marxist principles. This paper studies supply chain sust
Externí odkaz:
https://doaj.org/article/eb78ce7a63df4bcc9ffa8aac21fe088c
Publikováno v:
Engineering Proceedings, Vol 66, Iss 1, p 26 (2024)
The safe and appropriate disposal of waste generated during mining operations makes mining waste management a crucial concern for the mining sector. This waste includes waste rock, tailing, and other mining wastes that can cause health and environmen
Externí odkaz:
https://doaj.org/article/f2df950833a243bf8b9de250e3dddece
Publikováno v:
E3S Web of Conferences, Vol 532, p 01004 (2024)
This research demonstrates how Green Supply Chain Management (GSCM) can boost organizational performance and mitigate environmental risks in uncertain environments. The critical role of supplier selection in building resilient supply chains is a cent
Externí odkaz:
https://doaj.org/article/3433bb1c65c54eb393a51539480f3167
Dynamics of Pertinent Project Delay Variables in the Thai Construction Sector: Mathematical Analysis
Publikováno v:
Engineering Management in Production and Services, Vol 14, Iss 2, Pp 26-45 (2022)
Project completion behind schedule is a struggle for the construction sector, affecting time, cost, and quality. This investigation has been necessitated by the lingering nature of project delay risks despite many extant analyses. This study collated
Externí odkaz:
https://doaj.org/article/33e11032b88c486aafc892fc37a9f489
Autor:
Hong, Leo, Hales, Douglas N.
Publikováno v:
Industrial Management & Data Systems, 2021, Vol. 121, Issue 9, pp. 1969-1996.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/IMDS-10-2020-0598
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.