Zobrazeno 1 - 10
of 20
pro vyhledávání: '"D. Brent Barnett"'
Autor:
D. Brent Barnett, Stephen P. Reidel
Publikováno v:
Geoscience Canada. 47:187-214
The Columbia River Basalt Group is the youngest and best preserved continental Large Igneous Province on Earth. The 210,000 km3 of basaltic lavas were erupted between 16.6 and 5 Ma in the Pacific Northwest, USA. The peak of the eruptions occurred ove
Publikováno v:
Environmental Monitoring and Assessment. 71:91-106
A statistical quality control approach to detect changes in groundwater quality from a regulated waste unit is described. The approach applies the combined Shewhart-CUSUM control chart methodology for intrawell comparison of analyte concentrations ov
A core hole (C4998) and three boreholes (C4993, C4996, and C4997) were drilled to acquire stratigraphic and downhole seismic data to model potential seismic impacts and to refine design specifications and seismic criteria for the Waste Treatment Plan
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::20405fd632d9d7f17e5d3faf0609ed88
https://doi.org/10.2172/900926
https://doi.org/10.2172/900926
Autor:
Steve P. Reidel, Bruce N. Bjornstad, Karl R. Fecht, Colleen F. Rust, David C. Lanigan, D. Brent Barnett
In 2006, the U.S. Department of Energy initiated the Seismic Boreholes Project (SBP) to emplace boreholes at the Waste Treatment Plant (WTP) site in order to obtain direct shear wave velocity (Vs) measurements and other physical property measurements
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b3d1777a0aec188550a74c80fd0d8fd4
https://doi.org/10.2172/900923
https://doi.org/10.2172/900923
The purpose of this plan is to provide a post-closure groundwater monitoring program for the 216-S-10 Pond and Ditch (S-10) treatment, storage, and/or disposal (TSD) unit. The plan incorporates the sum of knowledge about the potential for groundwater
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::11a0885093254bab258f77a75c764c39
https://doi.org/10.2172/881940
https://doi.org/10.2172/881940
The model results presented in this report incorporates the reported data through June 2004 and then uses the updated discharge and tritium inventory values through 2034 based on more current information . Simulation results show that the tritium con
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::d95a78a22ffd1edc92bc52c8930cac30
https://doi.org/10.2172/15009897
https://doi.org/10.2172/15009897
Publikováno v:
Environmental management. 32(6)
Effluent monitoring typically requires a large number of analytes and samples during the initial or startup phase of a facility. Once a baseline is established, the analyte list and sampling frequency may be reduced. Although there is a large body of