Zobrazeno 1 - 10
of 5 431
pro vyhledávání: '"Critical Path Method"'
Publikováno v:
Jurnal Lebesgue, Vol 5, Iss 2, Pp 820-834 (2024)
Planning helps monitor activities. to achieve the expected efficiency and effectiveness. In advertising planning at GMS Digital Marketing, there are often losses. The purpose of this study is to find out how to manage good time in advertising plannin
Externí odkaz:
https://doaj.org/article/761d41f5e74e49258b83a17c38645cde
Publikováno v:
Jurnal Civil Engineering Study, Vol 4, Iss 01 (2024)
In some development projects, finishing the work inside a restricted time is normal. This can never again be kept away from after the utilization of labor with is presently not equally. CPM (Critical Path Method) is a critical path the that intends t
Externí odkaz:
https://doaj.org/article/21290c93aaf247ba95992097ad92890d
Autor:
LI Bin, HUANG Qibin
Publikováno v:
Jisuanji kexue yu tansuo, Vol 17, Iss 11, Pp 2620-2639 (2023)
The resource-constrained project scheduling problem is a classic combinatorial optimization problem with a wide range of engineering applications. Since the 1960s, many optimization algorithms have been used to solve this problem, but most intelligen
Externí odkaz:
https://doaj.org/article/9491cf01b5164f96af997f487b0ff82b
Autor:
Akan, Ercan
Publikováno v:
Business Process Management Journal, 2023, Vol. 29, Issue 4, pp. 1116-1158.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/BPMJ-08-2022-0368
Publikováno v:
OPSI, Vol 16, Iss 1, Pp 138-147 (2023)
One of the projects currently being undertaken by PT. XYZ is Dam “X”. Based on project management data obtained from PT. XYZ, the actual project construction process experienced a significant delay from the planned schedule, with a delay duration
Externí odkaz:
https://doaj.org/article/8c1a20f5880b4387b9da251f0089a6c3
Publikováno v:
IEEE Access, Vol 11, Pp 122502-122515 (2023)
The digitalization of data has recently had an impact on the building industry. Building information modeling (BIM) is a highly developed technology that is used to predict the cost, lifespan, energy use, and efficiency of buildings. To enhance the B
Externí odkaz:
https://doaj.org/article/ea55067ae5f14e62a8e2d49ee36ffe1a
Autor:
Christos Kyriklidis, Georgios Dounias
Publikováno v:
Data in Brief, Vol 49, Iss , Pp 109340- (2023)
Resource leveling is a highly complex optimization problem corresponding to adjusting a project's timeline (start and end dates) with the aim of matching resource allocation demands. The problem is particularly complex when a project is large and inv
Externí odkaz:
https://doaj.org/article/5c9a2d5d9d0e4a429f5c2e364075b2c2
Autor:
Norbert Chamier-Gliszczynski, Joanna Alicja Dyczkowska, Waldemar Woźniak, Marcin Olkiewicz, Roman Stryjski
Publikováno v:
Energies, Vol 17, Iss 6, p 1293 (2024)
Planning logistical processes supports the managerial processes of an enterprise, including investments such as wind farm construction. The aim of the article is to analyze and assess the time determinant in the logistical process of wind farm planni
Externí odkaz:
https://doaj.org/article/a6af14e921854b569fd4e7def4185747
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.