Zobrazeno 1 - 10
of 76
pro vyhledávání: '"Cost performance index"'
Publikováno v:
Tikrit Journal of Engineering Sciences, Vol 31, Iss 3 (2024)
Poor performance measuring procedures in the oil and gas sector can result in project cost overruns, schedule delays, and scope expansions. Earned value management, an integrated project planning and control system that monitors cost and schedule per
Externí odkaz:
https://doaj.org/article/12d8148ab2a04ca1a63ff51006917b23
Autor:
Junlin Ye, Azher M. Abed, Bhupendra Singh Chauhan, Bashir Salah, Sahar Hanifeh Dokht, Ahmed Deifalla, Ibrahim Mahariq
Publikováno v:
Case Studies in Thermal Engineering, Vol 57, Iss , Pp 104319- (2024)
Currently, with the energy crisis, combined heat and power systems provide significant advantages. A spiral heat exchanger (SHE) is among the greatest components utilized in these kinds of systems. There are a few notable failure modes (FMs) that can
Externí odkaz:
https://doaj.org/article/a3d18f1340ae4974aadafaa0325e904e
Publikováno v:
Tikrit Journal of Engineering Sciences, Vol 30, Iss 2 (2023)
Many oil and gas projects have been subjected to significant cost overruns and schedule delays, which is a major concern for the decision-makers in the oil industry. This paper aims to develop three mathematical models to estimate earned value indica
Externí odkaz:
https://doaj.org/article/72e766a709aa434e8e29b33aa2535024
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
International Journal for Computational Civil and Structural Engineering, Vol 18, Iss 1 (2022)
Construction projects, especially tunnel projects in the Arab world, suffer from poor documentation of data and information, and therefore there is a difficulty in estimating the budget or total costs or indicators of earned value, and with the advan
Externí odkaz:
https://doaj.org/article/a9f846c7bc404adeb3dc53f4991ae763
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Jarosław Konior
Publikováno v:
Buildings, Vol 12, Iss 8, p 1198 (2022)
The aim of the research results presented in the article was to develop a method that enables the analysis and evaluation of deviations at the stage of implementing a construction investment in various construction sectors. The new method was based o
Externí odkaz:
https://doaj.org/article/16b7039f21d3459eabb6ced108e13ae9
Exploring the Nature and Impact of Client-Related Delays on Contemporary Saudi Construction Projects
Publikováno v:
Buildings, Vol 12, Iss 7, p 880 (2022)
In rapidly developing countries such as the Kingdom of Saudi Arabia (KSA), where the construction of buildings and supporting infrastructure is critical to achieving strategic developmental milestones, delays to capital projects can derail other sect
Externí odkaz:
https://doaj.org/article/04f771e1b640465c9ea9da4de81450cd
Publikováno v:
Journal of Defense Analytics and Logistics, 2018, Vol. 2, Issue 2, pp. 94-109.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/JDAL-11-2017-0024