Zobrazeno 1 - 10
of 146
pro vyhledávání: '"Continuous mining"'
Publikováno v:
Gong-kuang zidonghua, Vol 50, Iss 10, Pp 168-178 (2024)
To understand the migration and distribution patterns of cutting dust in the continuous mining face under ventilation disturbance, the 15218 continuous mining face of the Hongliulin Coal Mine in Shaanxi was taken as the research object. A physical mo
Externí odkaz:
https://doaj.org/article/cb243d3cfb804ee7ac92943f0188c62e
Publikováno v:
Journal of Rock Mechanics and Geotechnical Engineering, Vol 16, Iss 9, Pp 3365-3377 (2024)
This article introduces a high-power microwave mechanical integrated continuous mining device, which can achieve synchronous cutting of hard rocks by microwave and machinery. The device includes a cutting system, a rotary translation system, a loadin
Externí odkaz:
https://doaj.org/article/9c3b52f5d18c47f18702d20a1b1e6b21
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
DAI Wenqi
Publikováno v:
Meikuang Anquan, Vol 53, Iss 7, Pp 195-200 (2022)
After the coal mining face is mined, the pressure transmitted by the surrounding rock in the goaf will experience a process from growth to stability, during this period, the growth rate and pressure distribution of overburden pressure in goaf have a
Externí odkaz:
https://doaj.org/article/013f44ea476a42c080c913d4fddf97ec
Publikováno v:
International Journal of Mining and Geo-Engineering, Vol 56, Iss 2, Pp 139-150 (2022)
Chehel Koureh mine project is located 110 km NW of Zahedan in the southeast of Iran. Due to the great depth of ore deposits, the underground exploitation method was chosen. In this research, the geomechanical parameters were obtained using in situ te
Externí odkaz:
https://doaj.org/article/5f7a99fcc7d24082b9d65cec046b0146
Publikováno v:
矿业科学学报, Vol 7, Iss 2, Pp 200-209 (2022)
In order to study the bearing characteristics of the roof and the coal pillar stability of continuous mining and continuous filling cemented filling field, a numerical analysis model based on FLAC3D is established to analyse the alternate bearing cha
Externí odkaz:
https://doaj.org/article/3020117155c64a9c99c383e4f9b97097
Publikováno v:
Frontiers in Earth Science, Vol 10 (2023)
To facilitate coal mining under the industrial square in Western China, short-wall paste continuous mining and continuous backfilling (PCMCB) is proposed to release the overlaid resources and handle coal gangue. First, the concept of short-wall PCMCB
Externí odkaz:
https://doaj.org/article/1b76070210204048b50f595804db5b8d
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.