Zobrazeno 1 - 10
of 526
pro vyhledávání: '"Construction firms"'
Autor:
Nguyen, Minh Van, Nguyen, Tu Thanh
Publikováno v:
Engineering, Construction and Architectural Management, 2023, Vol. 31, Issue 12, pp. 5085-5105.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-02-2023-0130
Publikováno v:
Engineering, Construction and Architectural Management, 2023, Vol. 31, Issue 12, pp. 5106-5127.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-03-2023-0211
Autor:
Badi, Sulafa, Nasaj, Mohamed
Publikováno v:
Engineering, Construction and Architectural Management, 2023, Vol. 31, Issue 11, pp. 4482-4515.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-12-2022-1131
Publikováno v:
Frontiers in Environmental Science, Vol 12 (2024)
This study investigates the impact of China’s carbon emission trading (CET) framework on the green development of the construction sector, a topic that has been underexplored. Utilizing annual data from 107 publicly listed construction companies fr
Externí odkaz:
https://doaj.org/article/d7d7a2246baa44009bfb6b9b7476fde7
Autor:
Azman, Mohd Azrai, Abdul-Samad, Zulkiflee, Lee, Boon L., Skitmore, Martin, Rajendra, Darmicka, Chuweni, Nor Nazihah
Publikováno v:
Engineering, Construction and Architectural Management, 2022, Vol. 31, Issue 2, pp. 618-637.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-11-2021-1018
Publikováno v:
Engineering, Construction and Architectural Management, 2022, Vol. 31, Issue 1, pp. 324-362.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-07-2021-0603
Autor:
Zhang, Yuguo a, Wang, Wenshun a, ⁎, Mi, Lingyun b, ⁎⁎, Liu, Ying a, Qiao, Lijie a, Ni, Guodong a, Wang, Xiangyang c
Publikováno v:
In International Journal of Disaster Risk Reduction May 2024 106
Publikováno v:
Measuring Business Excellence, 2023, Vol. 27, Issue 2, pp. 322-340.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/MBE-11-2021-0137
Autor:
Wael Abdelhameed, Esam M. H. Ismaeil
Publikováno v:
Buildings, Vol 14, Iss 6, p 1534 (2024)
BIM use has proved to be inevitable in construction project phases, starting from the project initiation phase and ending with the project closeout phase. Through the use of 4D/5D/6D models in processes of the construction project such as scheduling,
Externí odkaz:
https://doaj.org/article/1b87f67da5924850b48362bec6c5303c