Zobrazeno 1 - 10
of 57
pro vyhledávání: '"Ciapala, Edmond"'
Autor:
Ciapala, Edmond
This tutorial style publication covers elementary design and performance of high power RF systems in particle accelerators. It reviews the basics and presents an analysis of inductive and capacitively coupled systems leading to the commonly used simp
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::ee35b1d7e91e767be8b656e2fc8a5bb2
http://cds.cern.ch/record/2746200
http://cds.cern.ch/record/2746200
Autor:
Calaga, R, Zimmermann, Frank, Koutchouk, Jean-Pierre, Delayen, Jean, Pierini, Paolo, Ciapala, Edmond, McIntosh, Peter, Giovannozzi, Massimo, Brüning, Oliver, Collier, Paul, Funakoshi, Yoshihiro
The 3rd workshop on crab compensation for the LHC luminosity upgrade (LHC-CC09) was held September 16-18, 2008 at CERN, Geneva, Switzerland. The workshop was organized by joint collaboration of CERN, EUCARD, KEK and US-LARP. Approximately 50 workshop
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::b2cf15a030c050e28b971896f46b76d2
http://cds.cern.ch/record/1265837
http://cds.cern.ch/record/1265837
Autor:
Butterworth, A C, Angoletta, M E, Arnaudon, L, Baudrenghien, P, Bohl, T, Brunner, O, Ciapala, Edmond, Dubouchet, F, Höfle, Wolfgang, Linnecar, T P R, Maesen, P, Molendijk, J C, Shaposhnikova, E N, Tückmantel, Joachim, Valuch, D, Wehrle, U, Weierud, F
Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controller
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::e5f01f0fe9918bfa34f27a495d9905f4
http://cds.cern.ch/record/1212921
http://cds.cern.ch/record/1212921
Autor:
Ben-Zvi, I, Calaga, R, Assmann, R, Brüning, Oliver Sim, Brunner, O, Ciapala, Edmond, Dorda, U, Garoby, R, Koutchouk, Jean-Pierre, Linnecar, T, Tomás, R, Tückmantel, Joachim, Sun, Y, Zimmermann, F, Peterson, T, Solyak, N, Yakovlev, V, Rimmer,B, Wang, H, Hosoyama, K, Kota, N, Morita, A, Morita, Y, Oide, K, Seryi, A, Li, Z, Xiao, L, Burt, G, McIntosh, P A
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::a094b30a0b41bcaafda99c49ff98a5ea
http://cds.cern.ch/record/1201063
http://cds.cern.ch/record/1201063
Autor:
Ciapala, Edmond
Modifications to the ACS cavity tuning systems should be completed early in 2009. First tests on the power and low level RF systems will be done with waveguide shorts, as the cavities will be warm and the RUX45 tunnel roof blocks will still be open t
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::701c6419abe0513418323f7be8c2242b
http://cds.cern.ch/record/1172828
http://cds.cern.ch/record/1172828
Autor:
Linnecar, T, Angoletta, M E, Arnaudon, L, Baudrenghien, P, Bohl, T, Brunner, O, Butterworth, A, Ciapala, Edmond, Dubouchet, F, Ferreira-Bento, J, Glenat, D, Hagmann, G, Höfle, Wolfgang, Julie, C, Killing, F, Kotzian, G, Landre, D, Louwerse, R, Maesen, P, Martinez-Yanez, P, Molendijk, J, Montesinos, E, Nicou, C, Noirjean, J, Papotti, G, Pashnin, A, Pechaud, G, Pradier, J, Rossi, V, Sanchez-Quesada, J, Schokker, M, Shaposhnikova, E, Sorokoletev, R, Stellfeld, D, Tückmantel, Joachim, Valuch, D, Wehrle, U, Weierud, F
Hardware commissioning of the LHC RF Systems, the ACS Superconducting RF systems, ADT Transverse Dampers and APWL Wideband Longitudinal Monitors, started in late 2007 and was completed in time for the first LHC beams in 2008. The RF inter-machine syn
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::ad03a29480fa938e818b891339b7f9b8
http://cds.cern.ch/record/1176380
http://cds.cern.ch/record/1176380
A global LHC crab-cavity collaboration is rapidly advancing the R&D of a complete crab cavity cryomodule and performing the associated beam dynamics simulations compatible with a prototype test in the phase 0/I upgrade with the aim of establishing a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::7ebac7c24a363daf787b643a2854ecc3
http://cds.cern.ch/record/1159902
http://cds.cern.ch/record/1159902
Autor:
Baudrenghien, P, Butterworth, A, Ciapala, Edmond, Molendijk, J C, Olsen, R, Sorokoletov, R, Weierud, F
The low level RF systems for the LHC are based extensively on digital technology, not only to achieve the required performance and stability but also to provide full remote control and diagnostics facilities needed since most of the RF system is inac
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::c684bc2ef7fdc0a41118dcdb6fd47411
http://cds.cern.ch/record/971770
http://cds.cern.ch/record/971770
The Analog Signals Working Group was set up by the LHC Controls Project in May 2002 with a mandate to review current plans for new signal monitoring systems, coordinate prototyping work in pilot projects and produce an accelerator wide proposal for t
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::9fdaaabbda1ad8057961b7bd5fe8737b
http://cds.cern.ch/record/732044
http://cds.cern.ch/record/732044