Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Chunlong Nie"'
Publikováno v:
PLoS ONE, Vol 18, Iss 12, p e0295296 (2023)
The selection of construction plans for adverse geological conditions frequently encountered during the construction of bridge pile foundations will have a significant impact on the project's progress, quality, and cost. There is a need for the optim
Externí odkaz:
https://doaj.org/article/76365b0c01284e47a04b67d86fe8c1b6
Autor:
Muhammad Faisal Khan, Chunlong Nie
Publikováno v:
Advances in Urban Engineering and Management Science Volume 1 ISBN: 9781003305026
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::f82d93da1e0232c76abb99ed6540c912
https://doi.org/10.1201/9781003305026-35
https://doi.org/10.1201/9781003305026-35
Publikováno v:
Advances in Structural Engineering. 24:2885-2897
To improve the mechanical performances of joints in prefabricated construction, a type of connection structure with long-fiber and metal laminated bolts (referred to as a fiber-metal connector) is proposed and investigated by simulation and theoretic
Autor:
Shuang Shi, ChunLong Nie
Publikováno v:
2021 2nd International Conference on Computer Science and Management Technology (ICCSMT).
Autor:
Chunlong Nie, Hanbin Zhou
Publikováno v:
IOP Conference Series: Earth and Environmental Science. 669:012027
As the last step of the project cost review, auditing plays a vital role in the entire project. It can not only make the project cost more accurate, but also bring some economic indicators to the entire construction industry. This article uses the ga
Publikováno v:
IOP Conference Series: Earth and Environmental Science. 526:012195
The construction industry promotes the development of national social economy and provides necessary infrastructure and enhanced facilities for social comfort. However, it is the most hazardous industries due to high occupational risks and unsatisfac
Publikováno v:
IOP Conference Series: Materials Science and Engineering. 780:072030
Value-for-money evaluation can provide decision-making basis for the selection of public project implementation mode. As far as the current situation is concerned, there is a great controversy in the quantitative evaluation of value for money. This p
Publikováno v:
Proceedings of 2016 International Conference on Modeling, Simulation and Optimization Technologies and Applications (MSOTA2016).