Zobrazeno 1 - 10
of 80
pro vyhledávání: '"Chul Rim"'
Autor:
Chan Ju Lee, Suk Chul Rim
Publikováno v:
Mathematical Problems in Engineering, Vol 2019 (2019)
The inventory replenishment method of the demand-driven materials requirement planning (DDMRP) draws attention from both scholars and practitioners due to its lower average inventory and, simultaneously, lower stockout rate than existing methods. How
Autor:
Suk-Chul Rim, Hang T. T. Vu
Publikováno v:
Mathematical Problems in Engineering, Vol 2021 (2021)
Distribution centers (DCs) typically receive orders from the customers (mostly retail stores) located in their vicinity and deliver the ordered goods the next day morning. To maintain high item fill rate, DCs have to hold a high level of inventory, w
Autor:
Suk-Chul Rim, Myung-Chul Jung
Publikováno v:
Sustainability; Volume 14; Issue 9; Pages: 5229
Package deliverers are facing increasing workloads due to a rapid increase in online shopping caused by the recent outbreak of COVID-19 in the Republic of Korea. The purpose of this study was to evaluate the physical workload of package deliverers du
Autor:
Jingjing Jiang, Suk-Chul Rim
Publikováno v:
Mathematical Problems in Engineering, Vol 2017 (2017)
It is vital for make-to-order manufacturers to shorten the lead time to meet the customers’ requirements. Holding work-in-process (WIP) inventory at more stations can reduce the lead time, but it also brings about higher inventory holding cost. The
Autor:
Young-Hoon Kim, Suk-Chul Rim
Publikováno v:
Journal of the Korean society for railway. 18:619-629
The train conflict resolution problem refers to an adjustment of the train operation schedule in order to minimize the delay propagation when a train conflict is predicted or when a train conflict occurs. Previous train studies of train conflict reso
Publikováno v:
In Polymer February 2001 42(3):879-887
Autor:
Suk-Chul Rim, Young-Hoon Kim
Publikováno v:
Journal of the Korea Academia-Industrial cooperation Society. 15:3851-3857
Shippers’ requests of freight trains vary with time, but generating an additional schedule of freight trains is not easy due to many considerations, such as the line capacity, operation rules, and conflicts with existing trains. On the other hand,
Autor:
Chul Rim Choe
Publikováno v:
Composites Research. 26:147-154
Nanocarbons such as carbon nanotubes (CNT) and graphene are considered to be ideal fillers for polymer composites, because of their outstanding mechanical properties and high length-to-diameter ratio. There has been much effort to realize the impleme
Publikováno v:
Journal of Korean Institute of Industrial Engineers. 39:55-60
Tae-Seong Kim ․Cho-Won Kim ․Suk-Chul RimDepartment of Industrial Engineering, Ajou UniversityVNA(Very Narrow Aisle) forklift trucks require narrower aisle width than traditional counter-balanced trucks do because only the fork assembly turns in t
Autor:
Jingjing Jiang, Suk-Chul Rim
Publikováno v:
Mathematical Problems in Engineering, Vol 2016 (2016)
In order to meet the lead time that the customers require, work-in-process inventory (WIPI) is necessary at almost every station in most make-to-order manufacturing. Depending on the station network configuration and lead time at each station, some o