Publikováno v:
Journal of scheduling, 24 (3), 269–290
Scheduling of megaprojects is very challenging because of typical characteristics, such as expected long project durations, many activities with multiple modes, scarce resources, and investment decisions. Furthermore, each megaproject has additional
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::deda227837fc116bec00fb530f6fa4fe
Autor:
Christian Stürck, Patrick Gerhards
Publikováno v:
Operations Research Proceedings 2016 ISBN: 9783319557014
OR
OR
In this work we propose and analyze a hybrid approach for the multi-mode resource investment problem with tardiness penalty (MRIPT). The MRIPT is a project scheduling problem where, for a given deadline, the objective is to minimize the costs of reso
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c1b2f8455ed4b58c969096a5b45a857f
https://doi.org/10.1007/978-3-319-55702-1_68
https://doi.org/10.1007/978-3-319-55702-1_68
Publikováno v:
European J. of Industrial Engineering. 11:1
The multi-mode resource-constrained project scheduling problem is a well-known problem in the field of scheduling. The objective of the problem is to find the minimum makespan for the project. Hence, each activity has to be assigned to a mode and a s