Zobrazeno 1 - 10
of 31
pro vyhledávání: '"Christian Almeder"'
Autor:
Christian Almeder
Publikováno v:
Produktionsplanung und-steuerung ISBN: 9783662642900
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9593c0e9ef7b815d7bcf350c30c3c58d
https://doi.org/10.1007/978-3-662-64291-7_7
https://doi.org/10.1007/978-3-662-64291-7_7
Publikováno v:
Computers & Operations Research. 96:1-14
This work addresses the well-known capacitated lot sizing problem (CLSP) which is proven to be an NP-hard optimization problem. Simple period-by-period heuristics are popular solution approaches due to the extremely low computational effort and their
Autor:
Christian Almeder, Fanny Hein
Publikováno v:
International Journal of Production Economics. 177:66-76
In this work we assess the benefits of an integrated planning approach for the supply of raw material and the subsequent production process. The supply part is concerned with the collection of raw materials from geographically dispersed suppliers, wh
Publikováno v:
Repositório Científico de Acesso Aberto de Portugal
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
BASE-Bielefeld Academic Search Engine
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
BASE-Bielefeld Academic Search Engine
The hierarchical planning concept is commonly used for production planning. Dividing the planning process into subprocesses which are solved separately in the order of the hierarchy decreases the complexity and fits the common organizational structur
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::297778a2f8d400ca9965a256a0ccd53a
http://repositorio.inesctec.pt/handle/123456789/5724
http://repositorio.inesctec.pt/handle/123456789/5724
Publikováno v:
Computers & Industrial Engineering. 78:175-185
A scheduling problem for jobs with precedence constraints on parallel batch machines is discussed.The total weighted tardiness performance measure is considered.A simple batch forming procedure is described.A VNS and a GRASP scheme are proposed.VNS o
Publikováno v:
International Journal of Production Economics. 151:206-213
This paper refers to a hierarchical production planning system in a make-to-order environment. A challenging task in this context is to determine good production parameter settings in order to benefit from established planning methods. We present a f
Autor:
Richard F. Hartl, Christian Almeder
Publikováno v:
International Journal of Production Economics. 145:88-95
This work deals with a scheduling problem of a real-world production process in the metal–working industry. The production process can be described as an offline stochastic flexible flow-shop problem with limited buffers. In a first step, we analyz
Autor:
Christian Almeder
Publikováno v:
Dynamic Modeling and Econometrics in Economics and Finance ISBN: 9783319391182
Determining lot sizes is an essential step during the material requirements planning phase influencing total production cost and total throughput time of a production system. It is well-known that lot-sizing and scheduling decisions are intertwined.
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::cbe1f8aade2ae558b3fa8333e1945cfe
https://doi.org/10.1007/978-3-319-39120-5_19
https://doi.org/10.1007/978-3-319-39120-5_19
Publikováno v:
Repositório Científico de Acesso Aberto de Portugal
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
In this paper we present a novel approach to tackling the synchronisation of a secondary resource in lot-sizing and scheduling problems. This kind of problem occurs in various manufacturing processes (e.g. wafer testing in the semiconductor industry,