Publikováno v:
Journal of Engineering, Project, and Production Management, Vol 10, Iss 2, Pp 141-146 (2020)
Construction projects are much appreciated by both client and contractor when completed on schedule and within budget so as to avoid cost overruns. The Zambian building sector normally experiences time and cost overruns. This study investigated the f
Externí odkaz:
https://doaj.org/article/5ab5813c738a405885a80cd81cf4c250
Publikováno v:
Journal of Engineering, Project, and Production Management, Vol 10, Iss 2, Pp 141-146 (2020)
Construction projects are much appreciated by both client and contractor when completed on schedule and within budget so as to avoid cost overruns. The Zambian building sector normally experiences time and cost overruns. This study investigated the f
Publikováno v:
American Journal of Engineering and Applied Sciences. 12:420-431
Building designs normally are made to offer a given level of comfort to occupants without any mechanical intervention. However, with the advent of global warming temperatures globally have been seen to rise making the occupants of most buildings unco
Publikováno v:
International Journal of Construction Management. 20:321-334
In most instances, the construction client allocates risk by selecting the methods for procurement, payment and the contract form. Nevertheless, how favourably the contractor views the risk allocat...
Autor:
Chipozya Tembo-Silungwe
Publikováno v:
Proceedings of International Structural Engineering and Construction. 6
Risk misallocation has been a topic of discussion in the extent literature for some time now. The literature points out that risk management is the key to ensuring that optimal risk allocation is achieved. While the focus on risk allocation has been
Publikováno v:
Modern Environmental Science and Engineering. 1:156-163