Zobrazeno 1 - 10
of 17
pro vyhledávání: '"Chihyun Jung"'
Autor:
Kyungyung Kim, Jiwoong Jang, Dohyung Kim, Yeongchan Han, Jiyoung Bae, Chihyun Jung, Jonghoon Yi
Publikováno v:
New Physics: Sae Mulli. 69:295-301
Publikováno v:
New Physics: Sae Mulli. 69:208-214
Publikováno v:
New Physics: Sae Mulli. 68:477-485
Publikováno v:
New Physics: Sae Mulli. 68:358-362
Autor:
Satyajit Shinde, Garrett Szafman, Bradley Savoy, Jaana S. Rajachidambaram, Chihyun Jung, Shiladitya Chakravorty
Publikováno v:
2018 29th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC).
In semiconductor manufacturing regular tool monitoring is essential for quality control. For the case of furnace tools tool monitoring is done by processing tool qualification wafers on tools followed with measurements on the wafers. Regular tool qua
Publikováno v:
IEEE Transactions on Automation Science and Engineering. 12:309-323
A timed Petri net (TPN) has been widely used for modeling, scheduling, and analyzing discrete event dynamic systems. This study examines cyclic scheduling problems of a TPN to minimize the cycle time especially for automated manufacturing systems. Ap
Publikováno v:
Discrete Applied Mathematics. 167:202-216
For discrete event systems, time window constraints between two events are often required to control their behavior. Such time constrained discrete event systems are found in various industrial systems such as chemical vapor deposition processes for
Publikováno v:
IEEE Transactions on Automation Science and Engineering. 10:145-159
In the semiconductor manufacturing industry, the lot size currently tends to be extremely small, even being only 5-8 wafers, whereas conventional lots have 25 identical wafers. The smaller lot size is made because customers demand extremely small lot
Autor:
Chihyun Jung, Dae-Eun Lim
Publikováno v:
Sustainability; Volume 8; Issue 3; Pages: 263
Sustainability, Vol 8, Iss 3, p 263 (2016)
Sustainability, Vol 8, Iss 3, p 263 (2016)
We present a case study of the development of an adaptive forecasting system for a leading personal computer (PC) manufacturer in South Korea. It is widely accepted that demand forecasting for products with short product life cycles (PLCs) is difficu
Publikováno v:
IEEE Transactions on Semiconductor Manufacturing. 25:420-431
Most cluster tool scheduling studies assume identical access times between chambers or do not discuss the impact of access times. However, the optimal scheduling rule and the cycle time can depend on the access times or physical configuration of para