Zobrazeno 1 - 10
of 30
pro vyhledávání: '"Chan Yong Choi"'
Publikováno v:
Journal of the Korean Society for Railway. 25:751-759
Publikováno v:
Journal of the Korean Society for Railway. 25:298-309
Publikováno v:
Journal of the Korean Society of Hazard Mitigation. 21:185-192
In this study, the constructability of a full-depth precast deck installation on a steel girder bridge with injection channel connection was evaluated. This type of girder has been developed to avoid the overlap between the shear studs and the bridge
Study on the Standards and Algorithms for Condition Evaluation of Steel Plate Girder Railway Bridges
Publikováno v:
Journal of the Korean Society for Railway. 24:646-657
Publikováno v:
Journal of the Korean Society for Railway. 23:1067-1076
Publikováno v:
Journal of The Korean Society For Urban Railway. 7:533-544
Publikováno v:
Journal of the Korean Society for Railway. 22:604-616
Autor:
Byung Il Kim, Chan Yong Choi
Publikováno v:
Journal of The Korean Society For Urban Railway. 6:139-149
교통시설의 성능개선과 신규 건설로 인하여 지상 및 지하에서의 교통시설의 병행 및 교차가 빈번하게 발생한다. 특히, 도심지 확대로 대심도 도로, 지하철, 철도 등의 건설을 위하여 수평굴
Publikováno v:
Journal of the Korean Society for Railway. 21:290-299
Publikováno v:
Journal of the Korean Society for Railway. 21:177-188