Zobrazeno 1 - 10
of 21
pro vyhledávání: '"CHAO-YONG ZHANG"'
Autor:
Ting Zhou, Jing-Xiao Li, Chao-Yong Zhang, Yu-Gui Li, Jun Peng, Chun-Lou Wei, Meng-Hua Chen, Hua-Fu Zhou
Publikováno v:
BMC Cardiovascular Disorders, Vol 24, Iss 1, Pp 1-10 (2024)
Abstract Purpose This study was aimed to identify the risk factors that influence the mortality risk in patients with acute aortic dissection (AAD) within one year after discharge, and aimed to construct a predictive model for assessing mortality ris
Externí odkaz:
https://doaj.org/article/159b42d709cf491b8e315cc228664237
Publikováno v:
Biological Research, Vol 42, Iss 3, Pp 297-304 (2009)
Gallic acid was artificially added to the media to grow Fusarium oxysporum f.sp.niveum to investigate its effect on the pathogenic fungus. Results indicate that gallic acid inhibited the growth of F. oxysporum f.sp.niveum. The colony diameter, the co
Externí odkaz:
https://doaj.org/article/2ad85e030ea54d7893bfc08e9bdcd9a2
Publikováno v:
Journal of Central South University. 29:129-145
Publikováno v:
Applied Mechanics and Materials. :57-61
In this paper, a hybrid methodology that incorporates a simulated annealing (SA) approach into the framework of variable neighborhood search (VNS) is proposed to solve the blocking flow shop scheduling problem with the total flow time minimization. T
Publikováno v:
Applied Mechanics and Materials. 619:332-336
Manufacturing Grid (MG) is one of the most promising manufacturing modes in recent years, which has been proved to be a complex network characterized with scale-free. In this paper, the resource nodes of MG are treated as the nodes of a network and t
Autor:
Shengqiang Liu, Yuan Fang Wang, Wenwen Lin, Chao Yong Zhang, Xin Yu Shao, Dao Yuan Yu, San Qiang Zhang
Publikováno v:
Advanced Materials Research. :432-436
A mathematical model of multiple-linecollaborative manufacturing was formulated in this paper, and teaching-learning-based optimization algorithm was applied to solve the problem. A set of production orders are taken as example. The results prove tha
Publikováno v:
Applied Mechanics and Materials. 610:345-349
The stochastic two-sided assembly line is a special line in which workers perform assembly tasks in both sides of the line and the task time is not deterministic. In the improved teaching-learning-based optimization (ITLBO) algorithm, teacher and lea
Publikováno v:
Advanced Materials Research. 934:249-254
In MG environment, resource consumers choose the optimal resource service according to their non-functional demands for quality of service (QoS) in terms of service execution time, reliability, and availability. Non-functional requirements of QoS can
Publikováno v:
Advanced Materials Research. :1179-1184
In this paper, a hybrid genetic algorithm is presented for the flexible job-shop scheduling problem with makespan criterion. A new machine assignment strategy is proposed to improve the initial population. A modified coding scheme is presented, and a
Publikováno v:
Applied Mechanics and Materials. 521:707-713
With the developing of industry, the topic of energy-saving is attracting more and more attentions. However, the attentions have focused primarily on the design activities of the firm. The planning/scheduling activities of manufacturing are neglected