Zobrazeno 1 - 10
of 11
pro vyhledávání: '"C. Balakrishna Moorthy"'
Publikováno v:
International Journal of Smart Grid and Clean Energy. :662-669
Publikováno v:
TENCON
Renewable energy systems like wind, solar, ocean and tidal are prone to consistent weather changes which can be abrupt and quick in nature. Extracting maximum power from generators that are powered from renewable sources can be demanding. Maximum Pow
Publikováno v:
Wind Engineering. 38:633-642
In the present work, genetic algorithm has been used to resolve the placement of wind turbines in a wind park giving maximum power and efficiency with minimum number of turbines. Unlike past approaches where each plot was subdivided into smaller squa
Autor:
C. Balakrishna Moorthy, M. K. Deshmukh
Publikováno v:
International Journal of Sustainable Energy. 34:396-405
In the present study, particle swarm optimisation has been used to resolve the placement of wind turbines in a wind park giving maximum power and efficiency with minimum number of turbines. Unlike past approaches where each plot was subdivided into s
Autor:
C. Balakrishna Moorthy, M. K. Deshmukh
Publikováno v:
2016 IEEE International Conference on Power Electronics, Drives and Energy Systems (PEDES).
In this paper, using hourly average wind data recorded for a period of one year is used to estimate wind power potential in a region of Goa, India. The wind power potential is estimated using Weibull probability density function. In this paper, the W
Publikováno v:
Indian Journal of Science and Technology. 8
In this paper, the wind power is predicted using artificial intelligence techniques. The wind speed data as input and wind power data as output, measured at ten minutes interval for a period of eleven months are used for the study. The artificial int
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
C. Balakrishna Moorthy, M. K. Deshmukh
Publikováno v:
Energy Procedia. :141-148
Wind resource assessment is the key step in windfarm deployment at pre-investment stage. In a wind farm, it is often the case that wind climate data is measured at one place and it is required to estimate wind resource potential at any other point in
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.