Zobrazeno 1 - 10
of 1 928
pro vyhledávání: '"Budzier, A"'
The paper explores "uniqueness bias," a behavioral bias defined as the tendency of planners and managers to see their decisions as singular. For the first time, uniqueness bias is correlated with forecasting accuracy and performance in real-world pro
Externí odkaz:
http://arxiv.org/abs/2408.07710
Autor:
Budzier, Alexander, Flyvbjerg, Bent
The present paper is an update of the "Oxford Olympics Study 2016" (Flyvbjerg et al. 2016). We document that the Games remain costly and continue to have large cost overruns, to a degree that threatens their viability. The IOC is aware of the problem
Externí odkaz:
http://arxiv.org/abs/2406.01714
Autor:
Flyvbjerg, Bent, Budzier, Alexander, Lee, Jong Seok, Keil, Mark, Lunn, Daniel, Bester, Dirk W.
Publikováno v:
Journal of Management Information Systems, vol. 39, no. 3, fall issue, 2022
If managers assume a normal or near-normal distribution of Information Technology (IT) project cost overruns, as is common, and cost overruns can be shown to follow a power-law distribution, managers may be unwittingly exposing their organizations to
Externí odkaz:
http://arxiv.org/abs/2210.01573
Publikováno v:
Zeitschrift für Pflanzenkrankheiten (Pflanzenpathologie) und Pflanzenschutz, 1956 Dec 01. 63(12), 743-743.
Externí odkaz:
https://www.jstor.org/stable/43231716
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Robert Blumen
Publikováno v:
IEEE Software. 33:117-120
Software Engineering Radio host Robert Blumen speaks to Jurgen Laartz and Alexander Budzier about their joint research on large-IT-project failures.
The Olympic Games are the largest, highest-profile, and most expensive megaevent hosted by cities and nations. Average sports-related costs of hosting are $12.0 billion. Non-sports-related costs are typically several times that. Every Olympics since
Externí odkaz:
http://arxiv.org/abs/2009.14682
This study provides an independent, outside-in estimate of the cost and schedule risks of nuclear waste storage projects. Based on a reference class of 216 past, comparable projects, risk of cost overrun was found to be 202% or less, with 80% certain
Externí odkaz:
http://arxiv.org/abs/1901.11123
Autor:
Flyvbjerg, Bent, Budzier, Alexander
This report was commissioned by the Commission of Inquiry Respecting the Muskrat Falls Project to provide the national and international context in which the Muskrat Falls Project took place. The Commission asked for the report to cover three specifi
Externí odkaz:
http://arxiv.org/abs/1901.03698