Zobrazeno 1 - 10
of 11
pro vyhledávání: '"Buckeye Hills"'
Autor:
Harmon, Alaina
In this report, the results of data recovery efforts conducted for the Palo Verde to Pinal West transmission line project at the Gillespie Dam site, AZ T:13:18 (ASM), in the Gila Bend area of the Gila River are presented. The site is a prehistoric Ho
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::89bb796aadf1984ccb9440265ed0a386
Autor:
T. Kathleen Henderson
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, west
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::cfa59950b3356c9c7409b1cacbd92050
Autor:
Bild, David A.
Salt River Project (SRP) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey of a portion of the Arlington Wildlife Area (AWA), Maricopa County, Arizona. The project area is located on Arizona Game and Fish De
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::bffc4fabb087050d78fd2e517ebb3e90
Autor:
Dobschuetz, Kris
Arizona Public Service (APS) and Salt River Project (SRP) were issued a Certificate of Environmental Compatibility (CEC) by the Arizona Corporation Commission (ACC) for the construction of the Southwest Valley 500kV Transmission Line Project (Southwe
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::dbcf3ec5b5f7611256b1eb31d7841e28
Salt River Project Agricultural Improvement and Power District (SRP) proposes to construct and operate the 56-mile-long Palo Verde-Pinal West 500 kilovolt (kV) transmission line, which will deliver power from the Hassayampa Switchyard south of Winter
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::6016e2bb4a2d88947382c6b901a17ebb
Autor:
McLean, Roderic, Perry, Richard
Proposed wetland restoration and flood control by the U.S. Army Corps of Engineers (Corps) associated with the north bank of the Salt River, near confluences of the Agua Fria and Gila rivers, requires the identification of cultural resources as laid
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::33230ca99f06bae9a5a1fe3294db639b
Autor:
Macnider, Barbara
People were sent out to the pipeline near Gillespie Dam to monitor emergency salvage and construction activities in the vicinity of site AZ T:13:18 (ASM). The site is a Classic Period Hohokam village that also has both prehistoric and historic canal
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::46105bc5736a25f92229f4cb192066ce
At the request of Salt River Project, the Museum of Northern Arizona conducted an archaeological survey of a proposed 500kV transmission line between the Palo Verde Nuclear Generating Station (near Wintersburg, Arizona) and the Kyrene Substation (nea
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::0b35382a6fa2f0dba23fad899fa32f47
Autor:
Rodgers, James B.
The following report discusses archaeological data recently retrieved by Arizona State University through an intensive survey of Buckeye Hills East in south-central Arizona. The specific project area lies south of Buckeye, Arizona, and involves a sma
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::bef03ea5164aea8e10d6bf9a0b42fa6b
Autor:
Burton, Susan S.
This report provides a regional archaeological overview prepared for the Montezuma Hydroelectric Pumped-Storage Project by the Office of Cultural Resource Management, Department of Anthropology, Arizona State University, under contract with the Salt
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ca17ef7848287e39eeb6205d50854351