Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Borna Dasović"'
Autor:
Borna Dasović, Uroš Klanšek
Publikováno v:
Energies, Vol 15, Iss 7, p 2330 (2022)
This article reviews the accomplishments of studies in which optimization tools were used to develop energy-efficient and sustainable construction schedules. With the increase in global awareness of environmental issues, the construction industry has
Externí odkaz:
https://doaj.org/article/f5f54d27050b453a88a4b565b38f23a6
Publikováno v:
e-GFOS, Vol 7, Iss 13, Pp 12-22 (2016)
“Einstein’s riddle” is a popular example of constraints satisfaction problem. Since its introduction, different forms and variations of the riddle have been presented. Regardless of the variant of the riddle, its solution is considered a tough
Externí odkaz:
https://doaj.org/article/24b8c056253e474f948f3088bbfef18b
Publikováno v:
Buildings, Vol 9, Iss 1, p 21 (2019)
This paper presents an active building information modeling (BIM) approach for work facilities and the optimal positioning of tower cranes on construction sites with repetitive operations. In this context, the metamorphosis of a passive BIM approach
Externí odkaz:
https://doaj.org/article/8d84a8c81f464595a6e6a9b8d61ed46c
Autor:
Borna Dasović, Uroš Klanšek
Publikováno v:
Lecture Notes in Networks and Systems ISBN: 9783031052293
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9fa237c97fa9a409827c728f0f436e05
https://doi.org/10.1007/978-3-031-05230-9_107
https://doi.org/10.1007/978-3-031-05230-9_107
Autor:
Uroš Klanšek, Borna Dasović
Publikováno v:
New Technologies, Development and Application IV ISBN: 9783030752743
Successful completion of a construction project depends to a large extent on the appropriate scheduling of its activities. When planning the execution of a construction project, some of the activities critical to the project must be compressed in ord
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::034e2c0d5ee7599ec6174b1f1b1dc910
https://doi.org/10.1007/978-3-030-75275-0_116
https://doi.org/10.1007/978-3-030-75275-0_116
Publikováno v:
Sustainability
Volume 12
Issue 8
Sustainability, Vol 12, Iss 3405, p 3405 (2020)
Volume 12
Issue 8
Sustainability, Vol 12, Iss 3405, p 3405 (2020)
Construction scheduling, in practice, commonly relies on the usage of commercial project management tools (PMT) without specific optimization features. To obtain optimal schedules, planners often need to develop separate optimization models with spec
Autor:
Borna Dasović, Uroš Klanšek
Publikováno v:
Sustainability, Vol 13, Iss 12173, p 12173 (2021)
Sustainability
Volume 13
Issue 21
Sustainability
Volume 13
Issue 21
This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure of a high-level system for exact optimization and PM
Publikováno v:
e-GFOS, Vol 7, Iss 13, Pp 12-22 (2016)
Electronic Journal of the Faculty of Civil Engineering Osijek-e-GFOS
Volume 7
Issue 13
E-GFOS, no. 13, pp. 12-22, 2016.
Electronic Journal of the Faculty of Civil Engineering Osijek-e-GFOS
Volume 7
Issue 13
E-GFOS, no. 13, pp. 12-22, 2016.
“Einstein’s riddle” is a popular example of constraints satisfaction problem. Since its introduction, different forms and variations of the riddle have been presented. Regardless of the variant of the riddle, its solution is considered a tough