Zobrazeno 1 - 10
of 208
pro vyhledávání: '"Bhaba R. Sarker"'
Publikováno v:
IEEE Access, Vol 9, Pp 73286-73298 (2021)
Many parts or components in a facility are sometime vulnerable to failure causing downtime and production loss. So, in order to decrease the downtime, parts of the same type that follow the same lifespan distribution need to be replaced at least once
Externí odkaz:
https://doaj.org/article/7de1e6d4dd9f4144874e056fa2674e87
Publikováno v:
Advances in Mechanical Engineering, Vol 6 (2014)
The attack-angle optimization is a key problem for reentry trajectory design of a gliding type reusable launch vehicle (RLV). In order to solve such a problem, the equations of motion are derived first. A physical programming (PP) method is briefly p
Externí odkaz:
https://doaj.org/article/c5b43348ec7e464897b6a7acafdbd093
Publikováno v:
Mathematical Methods in the Applied Sciences. 45:11433-11448
Autor:
Md Imran Hasan Tusar, Bhaba R Sarker
Publikováno v:
Wind Engineering. 46:1629-1656
Offshore Wind Farm (OWF) downtime causes huge financial loss to the stakeholders. One of the major concerns for them is to reduce the downtime of the offshore wind turbine as much as possible. To do this, inventory managers must keep the required num
Publikováno v:
RAIRO - Operations Research. 56:1717-1735
The classical inventory control policies assume that orders are paid for at the time of their receipts, but in practice, suppliers may require retailers to pay a fraction of the purchasing cost in advance, and sometimes allow them to pay this cost in
Autor:
Zhixiang Chen, Bhaba R. Sarker
Publikováno v:
Journal of Modelling in Management, 2015, Vol. 10, Issue 3, pp. 296-324.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/JM2-12-2012-0044
Autor:
Imran Hasan Tusar, Bhaba R. Sarker
Publikováno v:
International Journal of Energy Research. 46:3739-3765
Publikováno v:
Production Engineering. 16:89-107
In this paper, we consider a joint decision-making issue of production and maintenance plan with imperfect and perfect maintenance actions for two-stage deteriorating JIT (Just-in-time) production systems with random breakdowns. The risk cost caused
Publikováno v:
Journal of Modelling in Management. 18:94-116
Purpose The purpose of this paper is to investigate the behavioral operations effect in production inventory decision of supply chain consisting of one manufacturer and one buyer, and analyze how the unfairness concerns impact the decision of product
Publikováno v:
International Journal of Production Research. 60:5029-5050
In a steel pipe manufacturing industry, several machining centres are used for different purposes, where tool magazines speed up the tool exchange and machine setup. Early tool replacement incurs u...