Zobrazeno 1 - 10
of 68
pro vyhledávání: '"Behrouz Afshar Nadjafi"'
Publikováno v:
Healthcare Informatics Research, Vol 27, Iss 1, Pp 73-81 (2021)
Objectives This paper presents a reference data model for blood bank management to control blood inventories considering real-world uncertainties and constraints. It helps information systems identify blood product status for various critical decisio
Externí odkaz:
https://doaj.org/article/1c2a4bf28d484141973f67f0fd5baee2
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol 5, Iss 10, Pp 55-63 (2012)
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming o
Externí odkaz:
https://doaj.org/article/bf904b2bda44465e85d40c66c58beb19
Autor:
Behrouz Afshar Nadjafi, Salman Kolyaei
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol Volume 3, Iss Issue 6, Pp 13-23 (2010)
The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume
Externí odkaz:
https://doaj.org/article/8e700ca371704baab781abcbfe357332
Autor:
Babak Abbasi, behrouz Afshar nadjafi
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol Volume 1, Iss Issue 1, Pp 48-54 (2010)
As is well known, estimating parameters of the tree-parameter weibull distribution is a complicated task and sometimes contentious area with several methods vying for recognition. Weibull distribution involves in reliability studies frequently and ha
Externí odkaz:
https://doaj.org/article/fa9ae92c115d4dbc93c4a35058c06933
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol Volume 1, Iss Issue 1, Pp 35-39 (2010)
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider th
Externí odkaz:
https://doaj.org/article/a4269319e79e47218a8a0febe82d8c8a
Publikováno v:
چشمانداز مدیریت صنعتی, Vol 13, Iss 2, Pp 9-38 (2023)
In the city of Qom, there is no dual water supply network with a separate meter inside the citizens' homes. On the other hand, high quality water sources do not meet all the drinking and non-drinking needs of the consumption areas. Therefore, the wat
Externí odkaz:
https://doaj.org/article/81a936cef9e04505aa6591168110280f
Publikováno v:
Mathematical Biosciences and Engineering, Vol 20, Iss 7, Pp 13015-13035 (2023)
Nowadays, with the rapid development of rail transportation systems, passenger demand and the possibility of the risks occurring in this industry have increased. These conditions cause uncertainty in passenger demand and the development of adverse im
Externí odkaz:
https://doaj.org/article/d895c7aaf2384edcae391b183ff30115
Publikováno v:
International Journal of Public Health, Vol 68 (2023)
Objective: This study assesses a multi-period capacitated maximal-covering location-allocation model for healthcare services, taking interservice referral as well as equity access into account.Methods: A two-stage optimization strategy is used to for
Externí odkaz:
https://doaj.org/article/42d85e44cb5d46838e2cf39f4e1f4974
Publikováno v:
چشمانداز مدیریت صنعتی, Vol 11, Iss 2, Pp 41-66 (2021)
This research studies cross-docking centers location and vehicles routing scheduling problems simultaneously in a three-level supply chain with discrete pick-up and delivery. The proposed problem is formulated as a mixed-integer nonlinear programming
Externí odkaz:
https://doaj.org/article/dfdf0ac9b6124899bf50146d2fc91a17
Autor:
Behrouz Afshar Nadjafi, Amir Abbas Najafi, Ali Akbar Shafikhani, Mostafa Pouyakian, Amir Kavousi
Publikováno v:
International Journal of Critical Infrastructures. 20:1